Design of an Oil and Gas Processing Plant by Using Dynamic Simulations
This study focusses on removing the fire insulation from pipes in a real oil and gas processing plant. To evaluate the pipes from which the fire insulation can be removed, a comparison between the pipe blow-down pressure and the hoop stress pressure has been performed for each pipe. The total fire insulation area of 763 m2 can be removed from the pipes in the plant.
Keywords: DEPRESSURIZATION; DYNAMIC SIMULATION; FIRE INSULATION; OIL AND GAS PROCESSING PLANT
Document Type: Research Article
Affiliations: Norsk Hydro Production, Bergen, Norway
Publication date: 01 June 2001