Skip to main content

Publisher: Taylor and Francis Ltd

More about this publication?
Volume 52, Number 13, 3 July 2014

Corrigendum
pp. i-i(1)

Favourites:
ADD

Guest Editorial
pp. 3755-3757(3)
Authors: Briskorn, Dirk; Pesch, Erwin; Werner, Frank

Favourites:
ADD
Favourites:
ADD

A new graphical approach for solving single-machine scheduling problems approximately
pp. 3762-3777(16)
Authors: Gafarov, Evgeny R.; Dolgui, Alexandre; Werner, Frank

Favourites:
ADD

Simulated annealing and genetic algorithms for the two-machine scheduling problem with a single server
pp. 3778-3792(15)
Authors: Hasani, Keramat; Kravchenko, Svetlana A.; Werner, Frank

Favourites:
ADD

Scheduling unrelated machines with two types of jobs
pp. 3793-3801(9)
Authors: Vakhania, Nodari; Hernandez, Jose Alberto; Werner, Frank

Favourites:
ADD

A job shop scheduling problem with human operators in handicraft production
pp. 3820-3831(12)
Authors: Agnetis, Alessandro; Murgia, Gianluca; Sbrilli, Simone

Favourites:
ADD

Bi-objective job shop scheduling with outsourcing options
pp. 3832-3841(10)
Authors: Guo, Xiuping; Lei, Deming

Favourites:
ADD

Dynamic set-up rules for hybrid flow shop scheduling with parallel batching machines
pp. 3842-3857(16)
Authors: Rossi, Andrea; Pandolfi, Andrea; Lanzetta, Michele

Favourites:
ADD

Scheduling flexible job shop problem subject to machine breakdown with game theory
pp. 3858-3876(19)
Authors: Sun, Di-hua; He, Wei; Zheng, Lin-jiang; Liao, Xiao-yong

Favourites:
ADD

Multi-level job scheduling in a flexible job shop environment
pp. 3877-3887(11)
Authors: Na, Hongbum; Park, Jinwoo

Favourites:
ADD

Solving parallel machines job-shop scheduling problems by an adaptive algorithm
pp. 3888-3904(17)
Authors: Gholami, Omid; Sotskov, Yuri N.

Favourites:
ADD

An effective genetic algorithm for flexible job-shop scheduling with overlapping in operations
pp. 3905-3921(17)
Authors: Demir, Yunus; İşleyen, Selçuk Kürşat

Favourites:
ADD
Favourites:
ADD

A multi-objective approach for a project scheduling problem with due dates and temporal constraints infeasibilities
pp. 3950-3965(16)
Authors: Pérez, Ángeles; Quintanilla, Sacramento; Lino, Pilar; Valls, Vicente

Favourites:
ADD
Favourites:
ADD

A modelling language for assembly sequences representation, scheduling and analyses
pp. 3986-4006(21)
Authors: Salmi, A.; David, P.; Summers, J.D.; Blanco, E.

Favourites:
ADD

A novel relational approach for assembly system supply planning under environmental uncertainty
pp. 4007-4025(19)
Authors: Danilovic, Milos; Vasiljevic, Dragan

Favourites:
ADD

Balancing reconfigurable machining lines via a set partitioning model
pp. 4026-4036(11)
Authors: Borisovsky, Pavel A.; Delorme, Xavier; Dolgui, Alexandre

Favourites:
ADD

Scheduling rotationally arranged robotic cells served by a multi-function robot
pp. 4037-4058(22)
Authors: Foumani, Mehdi; Gunawan, Indra; Ibrahim, Yousef

Favourites:
ADD

Multi-stage supply chain scheduling with non-preemptive continuous operations and execution control
pp. 4059-4077(19)
Authors: Ivanov, Dmitry; Sokolov, Boris; Dolgui, Alexandre

Favourites:
ADD

Two-stage scheduling in shelf-board production: a case study
pp. 4078-4092(15)
Authors: Waldherr, Stefan; Knust, Sigrid

Favourites:
ADD

A production scheduling problem with sequence-dependent changeover costs
pp. 4093-4102(10)
Authors: Li, Qingwei; Milne, R. John

Favourites:
ADD

  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content