Skip to main content

Publisher: Taylor and Francis Ltd

More about this publication?
Volume 51, Number 12, 1 June 2013

Favourites:
ADD
Favourites:
ADD
Favourites:
ADD
Favourites:
ADD

Robust makespan minimisation in identical parallel machine scheduling problem with interval data
pp. 3532-3548(17)
Authors: Xu, Xiaoqing; Cui, Wentian; Lin, Jun; Qian, Yanjun

Favourites:
ADD

A MILP model for the Accessibility Windows Assembly Line Balancing Problem (AWALBP)
pp. 3549-3560(12)
Authors: Calleja, Gema; Corominas, Albert; GarcĂ­a-Villoria, Alberto; Pastor, Rafael

Favourites:
ADD

Optimising lot sizing with nonlinear production rates in a multi-product single-machine environment
pp. 3561-3573(13)
Authors: Neidigh, Robert O.; Harrison, Terry P.

Favourites:
ADD
Favourites:
ADD

A hybrid artificial bee colony algorithm for the fuzzy flexible job-shop scheduling problem
pp. 3593-3608(16)
Authors: Wang, Ling; Zhou, Gang; Xu, Ye; Liu, Min

Favourites:
ADD

Fuzzy-metaheuristic methods to solve a hybrid flow shop scheduling problem with pre-assignment
pp. 3609-3624(16)
Authors: Yalaoui, Naim; Ouazene, Yassine; Yalaoui, Farouk; Amodeo, Lionel; Mahdi, Halim

Favourites:
ADD

Two-stage assembly flow-shop scheduling problem with non-identical assembly machines considering setup times
pp. 3625-3642(18)
Authors: Mozdgir, A.; Fatemi Ghomi, S.M.T.; Jolai, F.; Navaei, J.

Favourites:
ADD

Family based dispatching with batch availability
pp. 3643-3653(11)
Author: van der Zee, Durk-Jouke

Favourites:
ADD

Scheduling dual-armed cluster tools with cleaning processes
pp. 3671-3687(17)
Authors: Kim, Heejung; Kim, Hyun-Jung; Lee, Jun-Ho; Lee, Tae-Eog

Favourites:
ADD

Correlation among tardiness-based measures for scheduling using priority dispatching rules
pp. 3688-3697(10)
Authors: Mebarki, Nasser; Shahzad, Atif

Favourites:
ADD
Favourites:
ADD
Favourites:
ADD

A priority scheduling approach for flexible job shops with multiple process plans
pp. 3748-3764(17)
Authors: Doh, Hyoung-Ho; Yu, Jae-Min; Kim, Ji-Su; Lee, Dong-Ho; Nam, Sung-Ho

Favourites:
ADD

A solution procedure for Economic Lot Scheduling Problems even in high utilisation facilities
pp. 3765-3777(13)
Authors: Holmbom, Martin; Segerstedt, Anders; van der Sluis, Erik

Favourites:
ADD
Favourites:
ADD

  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content