Search Results

112 articles with title/keywords/abstract containing dynamic job shop scheduling

Key:
Free Content - Free Content
New Content - New Content
Subscribed Content - Subscribed Content
Free Trial Content - Free Trial Content
Display per page 

Ant Colony Optimisation for multi-level assembly job shop scheduling

Authors: Omkumar, M.; Shahabudeen, P.

Source: International Journal of Manufacturing Research, Volume 4, Number 4, 18 September 2009 , pp. 410-427(18)

Publisher: Inderscience Publishers

Scheduling manufacturing systems with blocking: a Petri net approach

Authors: Mejia, Gonzalo; Montoya, Carlos

Source: International Journal of Production Research, Volume 47, Number 22, January 2009 , pp. 6261-6277(17)

Publisher: Taylor and Francis Ltd

Dynamic job shop scheduling for missed due date performance

Authors: Alpay, Serafettin; Yuzugullu, Nihat

Source: International Journal of Production Research, Volume 47, Number 15, January 2009 , pp. 4047-4062(16)

Publisher: Taylor and Francis Ltd

Performance of an ant colony optimisation algorithm in dynamic job shop scheduling problems

Authors: Zhou, R.; Nee, A. Y. C.; Lee, H. P.

Source: International Journal of Production Research, Volume 47, Number 11, January 2009 , pp. 2903-2920(18)

Publisher: Taylor and Francis Ltd

Out-of-Core and Dynamic Programming for Data Distribution on a Volume Visualization Cluster

Authors: Frank, S.; Kaufman, A.

Source: Computer Graphics Forum, Volume 28, Number 1, March 2009 , pp. 141-153(13)

Publisher: Blackwell Publishing

GA based static scheduling of multilevel assembly job shops

Authors: Omkumar, M.; Shahabudeen, P.; Gughan, S.; Azad, A.

Source: International Journal of Operational Research, Volume 4, Number 2, 18 January 2009 , pp. 197-213(17)

Publisher: Inderscience Publishers

Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times

Authors: Vinod, V.; Sridharan, R.

Source: International Journal of Production Research, Volume 47, Number 6, January 2009 , pp. 1425-1447(23)

Publisher: Taylor and Francis Ltd

A heuristic for priority-based scheduling in a turbine manufacturing job-shop

Authors: Dulluri, Sandeep; Mahesh, V.; Rao, C.S.P.

Source: International Journal of Industrial and Systems Engineering, Volume 3, Number 6, 10 October 2008 , pp. 625-643(19)

Publisher: Inderscience Publishers

Combined column generation and constructive heuristic for a proportionate flexible flow shop scheduling

Authors: Huang, Yueh-Min; Shiau, Der-Fang

Source: The International Journal of Advanced Manufacturing Technology, Volume 38, Numbers 7-8, September 2008 , pp. 691-704(14)

Publisher: Springer

Adaptive scheduling and tool flow control in flexible job shops

Authors: Chen, Jie; Frank Chen, F.

Source: International Journal of Production Research, Volume 46, Number 15, August 2008 , pp. 4035-4059(25)

Publisher: Taylor and Francis Ltd

Applying Ant Colony Optimisation (ACO) algorithm to dynamic job shop scheduling problems

Authors: Zhou, Rong; Lee, Heow Pueh; Nee, Andrew Y.C.

Source: International Journal of Manufacturing Research, Volume 3, Number 3, 2 July 2008 , pp. 301-320(20)

Publisher: Inderscience Publishers

A robust scheduling rule using a Neural Network in dynamically changing job-shop environments

Authors: Eguchi, Toru; Oba, Fuminori; Toyooka, Satoru

Source: International Journal of Manufacturing Technology and Management, Volume 14, Numbers 3-4, 28 March 2008 , pp. 266-288(23)

Publisher: Inderscience Publishers

Simulating the generic job shop as a multi-agent system

Authors: Zhou, R.; Lee, H.P.; Nee, A.Y.C.

Source: International Journal of Intelligent Systems Technologies and Applications, Volume 4, Numbers 1-2, 22 December 2007 , pp. 5-33(29)

Publisher: Inderscience Publishers

Multicriteria dynamic scheduling by swapping of dispatching rules

Authors: Singh, Amol; Mehta, N.; Jain, P.

Source: The International Journal of Advanced Manufacturing Technology, Volume 34, Numbers 9-10, October 2007 , pp. 988-1007(20)

Publisher: Springer

Dynamic scheduling of production-assembly networks in a distributed environment

Authors: Masin, Michael; Pasaogullari, Melike Oz; Joshi, Sanjay

Source: IIE Transactions, Volume 39, Number 4, April 2007 , pp. 395-409(15)

Publisher: Taylor and Francis Ltd

Workflow-based dynamic scheduling of job shop operations

Authors: Hwang, H. C.; Choi, B. K.

Source: International Journal of Computer Integrated Manufacturing, Volume 20, Number 6, September 2007 , pp. 557-566(10)

Publisher: Taylor and Francis Ltd

Due date quoting and scheduling interaction in production lines

Author: Alfieri, A.

Source: International Journal of Computer Integrated Manufacturing, Volume 20, Number 6, September 2007 , pp. 579-587(9)

Publisher: Taylor and Francis Ltd

Parameter setting in a bio-inspired model for dynamic flexible job shop scheduling with sequence-dependent setups

Authors: Yu, Xuefeng; Ram, Bala; Jiang, Xiaochun

Source: European J. of Industrial Engineering, Volume 1, Number 2, 20 June 2007 , pp. 182-199(18)

Publisher: Inderscience Publishers

Key:
Free Content - Free Content
New Content - New Content
Subscribed Content - Subscribed Content
Free Trial Content - Free Trial Content
Share this item with others: These icons link to social bookmarking sites where readers can share and discover new web pages.
Page Help Click here for Page Help
Shopping cart
Tools
Sign in






Need to register?
Sign up here
Text size: A | A | A | A