Skip to main content

Regulatory Compliance and Public Acceptance Process Manage Utility Upgrade and Achieve Project Success

Buy Article:

$17.50 plus tax (Refund Policy)

Or sign up for a free trial

Abstract:

The 310-million gallons a day (mgd) Newtown Creek Wastewater Treatment Plant (WWTP) built in 1967 is New York City's largest wastewater treatment plant of the fourteen plants that service the New York metropolitan area. Located on 53-acres in a densely populated area in the Greenpoint section of Brooklyn, the plant treats wastewater from a drainage area of about 25 square miles, including parts of Brooklyn, Manhattan, and Queens. The existing plant was designed to remove approximately 60 to 70 percent of the influent. The plant is under a Federal Consent Order to upgrade the level of treatment to meet United States Environmental Protection Agency (USEPA) standards for secondary treatment. The plant will also be configured to provide treatment for the total combined storm and sewage flows that can be conveyed to the plant by the sewer system during wet-weather events (up to 700 mgd). The plant is currently undergoing a 4.0 billion upgrade with over 24 construction contracts and 16 general contractors with construction starting in 1995 and completion anticipated in 2017. Malcolm Pirnie, as part of a joint venture with Hazen and Sawyer and Greeley and Hansen, was retained by New York City Department of Environmental Protection (NYCDEP) to provide design and construction management services for plant upgrade. Project required early intervention and verification of involved regulatory agencies, stakeholders, private property owners, and local interest groups as a number of these parties will provide responses concerning potential environmental impacts and compliance requirements regarding this project. Over 40 Federal, State, and Local Agencies and Stakeholders were consulted to obtain over 1,500 permits to construction the upgrade.

Keywords: Guidance Documents; Management; Permit Identification; Permits; Public Acceptance; Regulatory Compliance; Tracking

Document Type: Research Article

DOI: https://doi.org/10.2175/193864711802764814

Publication date: 2011-01-01

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    A subscription to the Proceedings of the Water Environment Federation includes access to most papers presented at the annual WEF Technical Exhibition and Conference (WEFTEC) and other conferences held since 2000. Subscription access begins 12 months after the event and is valid for 12 months from month of purchase. A subscription to the Proceedings of the Water Environment Federation is included in Water Environment Federation (WEF) membership.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access. Access begins 12 months after the conference or event
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • Learn about the many other WEF member benefits and join today
  • Ingenta Connect is not responsible for the content or availability of external websites
  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more