Skip to main content

Unique Challenges Drive Innovative Solution – Buoyant Interceptor Sewer in a Lake

Buy Article:

$9.50 plus tax (Refund Policy)

Or sign up for a free trial

When City of Lake Oswego officials and their design consultant realized that the interceptor sewer running through the middle of Oswego Lake was seismically unstable and undersized, they asked and were able to answer many difficult questions. “How do you replace a sewer in a lake? How do you support it? Will it work? Will it last? Can we maintain it? ” The result was an innovative pipeline, completed in May 2011 after a 10–year planning, design, and construction process. Total program cost for the program was 90 million to replace and rehabilitate undersized, deteriorating lines with a system designed to last at least 100 years.

The innovative Lake Oswego Interceptor Sewer features a new 10,000—foot-long buoyant gravity pipeline consisting of 22- to 42-inch high density polyethylene (HDPE) pipe. The buoyant sewer is held to proper grade 11 to 18 feet beneath the lake surface by 428 ground anchors and tethers. A serpentine alignment provides thermal expansion loops to maintain grade despite wide-ranging water temperature. Stainless steel manholes are also buoyant and submerged, with access via removable caissons. The system also includes 7,000 feet of new pile-supported interceptor consisting of 22- to 42-inch HDPE pipe supported by 320 individual 18-inch piles. Rehabilitation of 6,000 feet of existing 18- to 36-inch-diameter sewers with cured-in-place pipe (CIPP) will extend the useful life of existing segments that are adequately sized and supported.

Construction of the project was divided into two major phases: Lake Full (completed while the lake was full) and Lake Down (completed while the lake was drawn down 24 feet). Marine pipeline work was conducted during the lake full phase, and final connections and associated excavations were made during the lake down phase. General contractors and key subcontractors were prequalified to ensure that skilled and experienced teams would be conducting the work. The complexities of the design, as well as the related installation issues and inevitable problemsolving that occurred during construction, warranted significant involvement by the design team and an experienced construction manager. This resulted in strong communication between all parties to enable construction issues to be solved quickly and efficiently.

Visit www.lakeinterceptor.com and view the professionally-produced “webisodes” to gain additional insight into this remarkable project.
No Reference information available - sign in for access.
No Citation information available - sign in for access.
No Supplementary Data.
No Article Media
No Metrics

Keywords: HDPE pipeline; buoyant pipeline; marine pipeline; sewer

Document Type: Research Article

Publication date: 2011-01-01

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    A subscription to the Proceedings of the Water Environment Federation includes access to most papers presented at the annual WEF Technical Exhibition and Conference (WEFTEC) and other conferences held since 2000. Subscription access begins 12 months after the event and is valid for 12 months from month of purchase. A subscription to the Proceedings of the Water Environment Federation is included in Water Environment Federation (WEF) membership.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access. Access begins 12 months after the conference or event
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • Learn about the many other WEF member benefits and join today
  • Ingenta Connect is not responsible for the content or availability of external websites
  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more