Three Procurement Methods and a Major Sole Source Used to Implement DC WASA's 300+ Million Biosolids Program

Buy Article:

$17.50 plus tax (Refund Policy)

Or sign up for a free trial

Abstract:

The District of Columbia Water and Sewer Authority (DC WASA) is implementing a 300+ million digestion project using traditional design-bid-build (DBB) for two omponent projects, design-build-operate (DBO) for a combined heat and power (CHP) system and design-build (DB) for the fourth component project, the main process train (MPT). The MPT encompasses pre-dewatering, the Cambi™ thermal hydrolysis process (THP), and anaerobic digesters. The economic benefits of this new biosolids program are tremendous compared to the costs associated with the existing lime stabilization system:

Biosolids quantities will be decreased between 50 and 60 percent, greatly reducing hauling and the risks of the current large land application program.


Lime purchases essentially will be eliminated.


A pathogen-free, more marketable Class A product will be produced.


Digester-generated biogas will fuel gas turbines to produce an estimated 13 MW of power and also produce steam for the THP.


Greenhouse gases will be greatly reduced.


With these major economic and risk-reduction benefits, it is important to get the project on-line as soon as possible. Therefore, the procurement method(s) selected to move the project forward are critical. Traditionally, DC WASA has utilized the DBB delivery method. This biosolids program includes major movement into alternative delivery (AD) methods. DC WASA's procurement regulations and guidelines have recently been re-written and approved by the Board of Directors to authorize AD.

Specific components of the paper include:

The Evaluating Team – The Owner's stakeholder groups, its external AD advisor and the Program Management team conducted a thorough evaluation of delivery methods. Its members include nationally-recognized expert “design-builders” and legal counsel that specialize in AD.


Expectation to Save Time – By implementing AD, DC WASA expects to get its new facility on-line more expeditiously than it would using a DBB procurement process.


New Procurement Regulations – New procurement policies were enacted by DC WASA in the midst of delivery method selection.


Alternative Delivery Methods – Various AD methods were considered for each of the four component projects. The evaluation considered the pros and cons of being prescriptive, willingness to accept risk, and other factors.


Sole-Source Component – DC WASA developed a “determination and findings” that concluded that Cambi is the sole-source provider of the designated THP.


Risk and More Risk – With each AD method, it was necessary to balance owner-retained risk with transferred risks, evaluating the associated impacts on project costs, the potential for disputes, and the potential for an expedited schedule.


What Did the Market Survey Tell Us? – DC WASA conducted a comprehensive market analysis of the four potential projects, interviewing 15 design builders, DBO firms, contractors, and engineers to help inform the owner's procurement decisions with the goal of ensuring the maximum amount of competition.

Keywords: Alternative Delivery; Biosolids management; Cambi™; Class A biosolids; Combined Heat and Power; Design-Build; Design-Build-Operate; Procurement; anaerobic digestion

Document Type: Research Article

DOI: https://doi.org/10.2175/193864710802767281

Publication date: 2010-01-01

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    A subscription to the Proceedings of the Water Environment Federation includes access to most papers presented at the annual WEF Technical Exhibition and Conference (WEFTEC) and other conferences held since 2000. Subscription access begins 12 months after the event and is valid for 12 months from month of purchase. A subscription to the Proceedings of the Water Environment Federation is included in Water Environment Federation (WEF) membership.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access. Access begins 12 months after the conference or event
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • Learn about the many other WEF member benefits and join today
  • Ingenta Connect is not responsible for the content or availability of external websites
  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more