Henderson's New Membrane Bioreactor Water Reclamation Facility – Choosing and Applying the Control System Architecture

Buy Article:

$9.50 plus tax (Refund Policy)

Or sign up for a free trial

The City of Henderson, Nevada is planning a new water reclamation facility that will serve the needs of its growing population. For this new satellite 8 million gallon per day (mgd) water reclamation facility, a membrane bioreactor (MBR) treatment alternative was selected. The configuration and operation of MBR facilities require careful selection of the control system architecture, including integration of the membrane equipment supplier controls with overall treatment plant processes, key data emulation methods, and a high reliability and redundancy configuration.

The system configuration has been based on MBR control system experience and was integrated into the procurement documents for the membrane equipment supplier, including requirements for support in the control system data emulation and integration throughout the plant control system.

The main concepts for the control system architecture are:



Programmable Logic Controller (PLC) System Design


Operator Interface Modules for Monitoring and Control


Network Communications System Design


Alarm and Response Management


Standby Power


This type of 5th generation MBR system requires multiple PLCs, and the configuration of the PLCs, I/Os, and control logic within each is important. The design includes redundant master PLCs as well as train PLCs, with the coordinating logic and control of utility services (air supply, chemical feed) resident in the masters while each train PLC acts as a slave and provides control of one or more individual trains of equipment.

Network communications between PLCs and with peripheral devices such as Operator Interfaces and plant SCADA systems must be maintained, since the master PLC must be able to initiate and coordinate certain train PLC events such as backpulsing, relax, flow setpoint adjustment, and recovery clean events. Fully looped redundant communications networks are required to ensure that there cannot be a single point of failure that would disrupt communications between the master and train PLCs.
No Reference information available - sign in for access.
No Citation information available - sign in for access.
No Supplementary Data.
No Article Media
No Metrics

Document Type: Research Article

Publication date: 2008-01-01

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    A subscription to the Proceedings of the Water Environment Federation includes access to most papers presented at the annual WEF Technical Exhibition and Conference (WEFTEC) and other conferences held since 2000. Subscription access begins 12 months after the event and is valid for 12 months from month of purchase. A subscription to the Proceedings of the Water Environment Federation is included in Water Environment Federation (WEF) membership.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access. Access begins 12 months after the conference or event
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • Learn about the many other WEF member benefits and join today
  • Ingenta Connect is not responsible for the content or availability of external websites
  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more