If you are experiencing problems downloading PDF or HTML fulltext, our helpdesk recommend clearing your browser cache and trying again. If you need help in clearing your cache, please click here . Still need help? Email help@ingentaconnect.com

FROM THEORY TO PRACTICE: PRELIMINARY AND PRIMARY TREATMENT RESIDUALS HANDLING IMPROVEMENTS

$17.50 plus tax (Refund Policy)

Buy Article:

Abstract:

The Upper Blackstone Water Pollution Abatement District (the “District”) treats wastewater, septage, and sludges generated in the central Massachusetts city of Worcester and surrounding communities, including a large urban area of combined sewers. This 45-million-gallon-per-day (mgd) advanced wastewater treatment facility, located near the headwaters of the Blackstone River, was constructed in 1976. In 2001, a NPDES permit was issued. In response to this permit the District commenced a facilities planning process which ultimately recommended plant-wide improvements so the facility would meet current codes and practice and to improve treatment and management of high wet-weather flows. The District is now in the midst of a 175 million plant improvements project. The first phase of upgrades was designed to expand and replace existing preliminary and primary treatment facilities, became fully operational in 2006.

Since the improvements came on-line, the plant operations staff have utilized the new tools provided, which include a new plant-wide SCADA system, in combination with their experience and knowledge as operators to optimize the process and fine tune the equipment and facilities. This optimization includes both improving removal efficiencies and providing better handling and management of grit, screenings, primary sludge and primary scum. Plant operations staff and CDM gathered data and conducted analyses in an attempt to optimize these processes, searching for optimal primary sludge pumping rates and concentrations of scum for pumping and storage. While much was learned through varying the rates and parameters of these systems, conclusive evidence of an optimal pumping cycle time remains elusive. This paper will address a number of the elements where fine tuning of the systems provided more efficient operation.

Document Type: Research Article

DOI: http://dx.doi.org/10.2175/193864707787974373

Publication date: January 1, 2007

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access.
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • ingentaconnect is not responsible for the content or availability of external websites

Tools

Favourites

Share Content

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
ingentaconnect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more