BETWEEN A TREE AND A HARD PLACE: PUBLIC INVOLVEMENT IN SEWER SYSTEM PLANNING

Buy Article:

$9.50 plus tax (Refund Policy)

Or sign up for a free trial

The Orange Water and Sewer Authority (OWASA) is the water and sewer service provider for the areas of Chapel Hill and Carrboro, North Carolina. In the heart of Chapel Hill lies the University of North Carolina-Chapel Hill (UNC-CH) also serviced by OWASA through parallel 18-inch sewer mains referred to as the Meeting of the Waters Interceptor (MWI). These pipelines dating back to the 1940s were laid adjacent to the Meeting of the Waters Creek and continued downstream to the Mason Farm Wastewater Treatment Plant (WWTP). The MWI travels along the edge of a large property that was subsequently set aside by its owner, William Coker, for the University and made part of the North Carolina Botanical Garden (NCBG). This land was called the Coker Pinetum and is a valued part of the University's plan for protecting forested areas and significant trees. Downstream of the Coker Pinetum, the MWI runs along small local roads and then adjacent to the northern edge of the main NCBG property to the WWTP.

Through recent master planning efforts for OWASA and UNC-CH, the existing 18-inch pipes of the MWI were identified as having insufficient capacity to convey future peak flows as the University continues its 1 billion expansion. Initial study recommendations suggested that replacing the aging clay pipes with a new single 36-inch ductile iron pipe would address the capacity issue. At the same time, OWASA was implementing a project to supply reclaimed water from the WWTP back to the UNC-CH campus for use in a variety of applications through a new 24-inch pressurized reclaimed water transmission main. These two projects would likely follow a similar route from the campus to the WWTP.

Review of the natural topography of the area showed that the existing route along the Coker Pinetum was the only available corridor to allow gravity flow. OWASA staff presented the project to the local community in a public meeting to inform them of the issues and gather input. The NCBG staff and local residents, many who take personal interest in their adjacent forest, were concerned about the impact to the trees, creek, and disruption to the local roads of the adjoining neighborhoods. OWASA staff used the public input and implemented an Alternative Evaluation Project. Brown and Caldwell was retained to investigate various project alternatives (including construction of a new pump station to avoid piping through the Coker Pinetum area) using a Pairwise Comparison process. After developing a life-cycle cost analysis, investigating existing easements, preparing a thorough tree survey, and identifying pump station site requirements, the results were presented to the community.

Using a thorough evaluation process and continuous communication with the local stakeholders, a project consensus was developed that OWASA is optimistic can be carried successfully through construction. This paper will review the decision-making and public involvement process and describe the challenges and accomplishments of the project.
No Reference information available - sign in for access.
No Citation information available - sign in for access.
No Supplementary Data.
No Article Media
No Metrics

Document Type: Research Article

Publication date: 01 January 2007

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    A subscription to the Proceedings of the Water Environment Federation includes access to most papers presented at the annual WEF Technical Exhibition and Conference (WEFTEC) and other conferences held since 2000. Subscription access begins 12 months after the event and is valid for 12 months from month of purchase. A subscription to the Proceedings of the Water Environment Federation is included in Water Environment Federation (WEF) membership.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access. Access begins 12 months after the conference or event
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • Learn about the many other WEF member benefits and join today
  • Ingenta Connect is not responsible for the content or availability of external websites
  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more