Skip to main content

Asset Management Studies with Limited Budgets

Buy Article:

$17.50 plus tax (Refund Policy)

Or sign up for a free trial

Abstract:

With more than 1,500 pieces of aging equipment at its four wastewater treatment plants and two outfall pipelines, the South Orange County Wastewater Authority retained Tetra Tech, Inc., to develop an Assessment Management Plan. The objective of the assignment was to ensure the accuracy of long-term financial forecasting for the timely repair and/or replacement of assets constructed and/or installed more than more than 25 years ago. With a severely restricted budget, project challenges included researching and developing detailed equipment lists; assigning cost estimates to replacement value for all assets; and, developing equipment life estimates and annual replacement cost projections.

Document Type: Research Article

DOI: https://doi.org/10.2175/193864706783779078

Publication date: 2006-01-01

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access.
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • Ingenta Connect is not responsible for the content or availability of external websites
  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more