Clearing Regulatory & Financing Hurdles a Border Town Success Story

Buy Article:

$17.50 plus tax (Refund Policy)

Or sign up for a free trial

Abstract:

Construction and operation of the new City of Somerton (the City) Wastewater Treatment Plant (WWTP) supports the City's economic development, assists the City with continued growth, and resolves specific human health and environmental issues. The old lagoon treatment facility frequently discharged less than optimal effluent as a result of overload at peak flow rates. With a series of three continuous-flow aerated and facultative lagoons, the previous lagoon system could not meet NPDES permit discharge limit requirements on a consistent basis, especially during peak flow rates. This condition limited the City's growth and development. Ultimately, it was deemed necessary to construct a new WWTP.

Phase I Construction of the Somerton WWTP Lagoon Replacement Project was completed in November 2003. It included closure of the polishing lagoon, construction of bypass piping and the installation of equipment required for interim operations. Technology for the new plant will to replace the existing lagoon system with sequencing batch reactors (SBR).

Completion of the new WWTP, currently under construction, is anticipated in the first quarter of 2006. During construction, Somerton is operating two of the three lagoons with added surface aeration and a flow curtain to minimize short circuiting. The new WWTP will provide for 0.8 million gallon per day (gpd) of biological treatment, a 30% increase in capacity over current average wastewater flow conditions. The new WWTP includes expandability to 1.6 mgd capacity in 0.2 mgd increments on the 1.5 acre area site, formerly known as Lagoon No. 3. Closure of the two remaining lagoons is planned upon completion; start-up and commissioning of the new WWTP will provide the City with an additional 12 acres of land for various municipal uses and/or economic development projects.

This paper will provide a project overview of the City's WWTP Lagoon Replacement Project and discuss issues of negotiating through this multifaceted regulatory framework. Topics include the permitting issues, economic limitations and requirements, and the funding entities and mechanisms explored and/or utilized in order to make the project move forward that include Border Environmental Corporation Commission (BECC), North American Development Bank (NAD Bank), Department of Agriculture – Rural Development (RD), and the Water Infrastructure Finance Authority of Arizona (WIFA).

Document Type: Research Article

DOI: https://doi.org/10.2175/193864706783761617

Publication date: 2006-01-01

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    A subscription to the Proceedings of the Water Environment Federation includes access to most papers presented at the annual WEF Technical Exhibition and Conference (WEFTEC) and other conferences held since 2000. Subscription access begins 12 months after the event and is valid for 12 months from month of purchase. A subscription to the Proceedings of the Water Environment Federation is included in Water Environment Federation (WEF) membership.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access. Access begins 12 months after the conference or event
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • Learn about the many other WEF member benefits and join today
  • Ingenta Connect is not responsible for the content or availability of external websites
  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more