Skip to main content

An Operational Perspective to Real Time Control for Consent Decree Compliance

The full text article is not available for purchase.

The publisher only permits individual articles to be downloaded by subscribers.

or click here to sign up for a free trial


Whether you're planning to implement a multi-million dollar robust Real Time Control (RTC) system or a scaled-down simple version, there are several critical elements necessary for successful implementation and utilization by the Publicly Owned Treatment Works (POTW) staff. These critical components range from changing performance expectations to inclusion of the wastewater treatment plant operators and collection systems staff in all phases of programdevelopment and implementation.

The Louisville and Jefferson County Metropolitan Sewer District (MSD) has initiated the second phase of their RTC program, with plans to ultimately implement a program targeted to cost approximately 83M. The in-line control portion of the program is targeted to cost approximately 30M, with the remaining cost for off-line storage facilities.

The first phase contained five control points, providing a system-wide average annual overflow volume reduction of 10 to 20%. The second phase, currently being designed, includes the addition offour control points. Ultimate build-out of the entire RTC program is targeted to be approximately20 control points.

During the planning, design and implementation of the first phase, MSD staff successfully navigated past an intense learning curve. Starting with a design team of engineering staff, the process evolved to a design and implementation team that included both engineering and operations staff. Operations staff was integrated in design, review, and implementation, including self-performing a portion of the local programming during construction.

This paper summarizes lessons learned, including advice on program implementation which may assist other POTWs currently considering implementation of similar programs. While only the initial phase of RTC is required by the Louisville Consent Decree, future phases are discussed as they are proposed in Consent Decree long-term planning documents.

Document Type: Research Article


Publication date: January 1, 2006

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access.
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • Ingenta Connect is not responsible for the content or availability of external websites

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Partial Open Access Content
Partial Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more