SOLUTIONS FOR TODAY MEET FUTURE NEEDS – STATE-OF-THE-ART SOLIDS THICKENING AT THE 91ST AVENUE WASTEWATER TREATMENT PLANT

$17.50 plus tax (Refund Policy)

Buy Article:

Abstract:

Staying ahead of the solids treatment curve has been a continual challenge at the 91st Avenue Wastewater Treatment Plant (91st Ave WWTP) near Phoenix, Arizona. This facility, which has a current capacity of 680 million liter per day (179.25 million gallons per day (mgd)), services the cities of Phoenix, Glendale, Mesa, Scottsdale and Tempe, has been expanded twice over the past 10 years, and future expansions are planned to an ultimate capacity of 1,135 million liter per day (300 mgd) to meet the wastewater treatment needs of the growing population of the Valley of the Sun. Treating primary and waste activated solids from this plant requires approximately 50 percent of the plant's operating budget, occupies an ever increasing share of the available land space for future expansions, and has required millions in capital funds for new facilities for the higher solids loads. To meet this challenge, Brown and Caldwell and the City of Phoenix (agency responsible for operating the 91st Ave WWTP) worked together to address the thickening needs of the current plant and future plant expansions by successfully consolidating thickening operations into one facility – the Solids Thickening Facility (STF) - and implementing centrifugal thickening using machines with the highest throughput capacity available. The result: lower operating costs for solids thickening, improved efficiency in solids treatment, and a single facility designed and constructed to meet the plant's thickening needs through 2025.

This paper will describe the key decision points in the project, including conceptual design, centrifuge selection, and detailed design leading to facility start-up in January 2004. Over 20 months of operating data from the completed centrifuge facility, thickening waste activated sludge, will be presented together with comparison data from the plant's dissolved air flotation thickeners.

Document Type: Research Article

DOI: http://dx.doi.org/10.2175/193864706783796989

Publication date: January 1, 2006

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access.
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • ingentaconnect is not responsible for the content or availability of external websites

Tools

Favourites

Share Content

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
ingentaconnect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more