Skip to main content

INTERIM CONTRACT MANAGEMENT: AN EFFECTIVE BRIDGE TO STABLE LONG-TERM OPERATIONS

Buy Article:

$17.50 plus tax (Refund Policy)

Or sign up for a free trial

Abstract:

Many water and wastewater utilities in the United States are facing the dilemma of how to deal with senior personnel retirements and associated succession planning. This paper presents three case histories addressing how this problem was handled smoothly and successfully with minimal disruption to operations through the utilization of contract management. Contract management involves temporarily providing experienced senior leadership to a utility on a full time basis until the situation stabilizes.

In the town of Wareham, Massachusetts, the chief operator, assistant chief operator, and maintenance manager were either terminated or resigned. Contract management was used to provide an operations and maintenance (O&M) assistance program for the wastewater plant and pumping stations. An assessment was performed to evaluate possible advantages and risks associated with privatization.

In Rockland, Massachusetts, the utility's long-time contract operator was displaced due to state procurement concerns. When the community and the contractor were unable to agree on an interim solution, an alternative means of providing continuous reliable wastewater treatment services was created utilizing contract management.

In Westfield, Massachusetts, when the long-term plant supervisor retired and a suitable replacement was not readily available from existing staff, a short-term need to sustain routine O&M activities was needed. Contract management provided an opportunity to independently evaluate current O&M practices, assist in identifying and recruiting a permanent replacement, and give additional support and training to existing staff.

In each case, an interim strategy was developed to bridge the utility from a short-term immediate crisis, to a viable long-term solution. The objective was to stabilize operations while preserving long-term options, and reassessing future goals and needs of the utility without committing to a “quick fix” solution.

Interim contract management offered the solution to guiding and retaining personnel through difficult transition situations, and allowed time to evaluate alternatives addressing both immediate needs and preferred long-term solutions.

Document Type: Research Article

DOI: https://doi.org/10.2175/193864706783789905

Publication date: 2006-01-01

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    A subscription to the Proceedings of the Water Environment Federation includes access to most papers presented at the annual WEF Technical Exhibition and Conference (WEFTEC) and other conferences held since 2000. Subscription access begins 12 months after the event and is valid for 12 months from month of purchase. A subscription to the Proceedings of the Water Environment Federation is included in Water Environment Federation (WEF) membership.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access. Access begins 12 months after the conference or event
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • Learn about the many other WEF member benefits and join today
  • Ingenta Connect is not responsible for the content or availability of external websites
  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more