If you are experiencing problems downloading PDF or HTML fulltext, our helpdesk recommend clearing your browser cache and trying again. If you need help in clearing your cache, please click here . Still need help? Email help@ingentaconnect.com

A COMBINED USE ATTAINABILITY ANALYSIS AND TECHNOLOGY-BASED APPROACH TO SETTING ZINC STANDARDS FOR TMDL COMPLIANCE

$17.50 plus tax (Refund Policy)

Buy Article:

Abstract:

Historic mining activities at the London Fault Mine in Park County, Colorado, generate uncontrolled mine drainage which impacts water quality in South Mosquito Creek and Mosquito Creek. Water quality impacts have lead to 303(d) listing for both streams based on exceedances of chronic zinc table value water quality standards and the need for a total maximum daily load (TMDL). Historically, zinc concentrations in South Mosquito Creek zinc ranged from 110 µg/L to 749 µg/L and 95 µg/L to 750 µg/L in Mosquito Creek. The chronic zinc table value standards for South Mosquito Creek and Mosquito Creek are 250 µg/L and 110 µg/L, respectively.

Historically, two mine adits at the London Fault Mine, the Extension Tunnel and the Water Tunnel, have had uncontrolled discharges of metals laden water to South Mosquito Creek which impacts the quality of Mosquito Creek, located downstream. Currently, only the Water Tunnel is permitted under the Colorado Discharge Permit System and the Extension Tunnel is unregulated, but provides a zinc load to South Mosquito Creek five times greater than the Water Tunnel. Since multiple years of discharge permit negotiations for the Extension Tunnel have been unsuccessful, alternative approaches to regulate both discharges were investigated, including obtaining funding from the owner (THF Reality) of the water right at the Water Tunnel to support site-specific studies.

Since limited funding was available from the owner of the London Fault Mine, Brown and Caldwell, through support from THF Reality, developed a multi-pronged approach to support appropriate South Mosquito Creek and Mosquito Creek beneficial uses while cost effectively allowing the Water Tunnel discharge to provide augmentation water for downstream water supply needs. The multi-pronged approach included: (1) evaluating treatment alternatives for both the Extension Tunnel and Water Tunnel to meet the proposed draft TMDL wasteload allocation for zinc; and (2) develop site-specific zinc water quality standards to reflect South Mosquito Creek and Mosquito Creek actual physical, chemical and biological conditions.

Through the multi-pronged process a technology-based approach was developed and approved by the Colorado Water Quality Control Division and Commission. The technology-based approach focused on developing site-specific chronic zinc water quality standards using ambient (85th percentile) water quality as the standard, with treatment of the Extension Tunnel discharge. This approach provided substantial improvements to South Mosquito Creek and Mosquito Creek water quality, substantial cost savings by treating the Extension Tunnel discharge versus the Water Tunnel discharge and TMDL compliance.

Document Type: Research Article

DOI: http://dx.doi.org/10.2175/193864705783868214

Publication date: January 1, 2005

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access.
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • ingentaconnect is not responsible for the content or availability of external websites

Tools

Favourites

Share Content

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
ingentaconnect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more