Skip to main content

HIGH RATE CHEMICALLY ENHANCED PRIMARY TREATMENT AS A TOOL FOR WET WEATHER PLANT OPTIMIZATION AND RE-RATING

Buy Article:

$9.50 plus tax (Refund Policy)

Or sign up for a free trial

King County, Washington is currently designing their new 38 million-gallon-per-day (mgd) Brightwater Wastewater Treatment Plant to include membrane bioreactors (MBR) for secondary treatment, combined with enhanced primary treatment for peak flow management. Enhanced primary treatment was of interest as a method of reducing MBR size for Brightwater. The County initially selected ballasted sedimentation for the peak flow primary treatment role. Chemically enhanced primary treatment (CEPT) using conventional primary clarifiers was not initially considered a viable alternative due to low surface overflow rates assumed necessary for adequate performance. A review of reported results from CEPT operation at several plants on the west coast and King County's own past pilot efforts yielded little useful data at high SORs. However, substantial capital cost savings would be realized if CEPT proved successful at SORS of 3,500 to 5,000 gallons per day per square foot (gpd/ft2 and gpd/sf). In a separate investigation, the County was interested in the potential of CEPT to contribute to additional capacity at their East Section Reclamation Plant (South Plant). Recognizing the limited data for CEPT at high overflow rates, the County undertook further full scale pilot testing to understand both potential performance at high overflows and test new chemical blends that had been reported to significantly improve CEPT performance. Full scale testing conducted at the South Plant over the winter of 2004/2005 demonstrated BOD removals above 40 percent at surface overflow rates (SORs) of 5,000 gallons per day per square foot and above 60 percent at SORs of 3,600 gpd/ft2. Based on this outstanding performance at high surface overflow rates, the County found that CEPT was cost effective for its Brightwater Plant and selected it in lieu of ballasted flocculation. The County is currently considering the potential to re-rate South Plant to recognize significant capacity through use of CEPT for peak flow treatment.

CEPT, with use of modern chemical mixtures and proper chemical dosing protocols, makes sense for intermittent usage during high flow events for a number of potential applications. Plant re-rating using the technology could avoid the construction of new treatment units in many instances.
No Reference information available - sign in for access.
No Citation information available - sign in for access.
No Supplementary Data.
No Data/Media
No Metrics

Document Type: Research Article

Publication date: 2005-01-01

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    A subscription to the Proceedings of the Water Environment Federation includes access to most papers presented at the annual WEF Technical Exhibition and Conference (WEFTEC) and other conferences held since 2000. Subscription access begins 12 months after the event and is valid for 12 months from month of purchase. A subscription to the Proceedings of the Water Environment Federation is included in Water Environment Federation (WEF) membership.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access. Access begins 12 months after the conference or event
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • Learn about the many other WEF member benefits and join today
  • Ingenta Connect is not responsible for the content or availability of external websites
  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more