INNOVATIVE CONTRACT APPROACH CHOSEN FOR CONSTRUCTION OF WATER RECLAMATION FACILITY

Buy Article:

$17.50 plus tax (Refund Policy)

Or sign up for a free trial

Abstract:

The City of Plant City needed to increase their plant capacity and meet stringent effluent requirements within a limited budget and schedule. To meet these requirements the City selected a modified Construction Management (CM) at Risk approach to the construction of the plant expansion.

Plant capacity must increase from 8 to 12 mgd to meet growing demands. The expanded plant must reliably and consistently achieve 3 mg/L Total Nitrogen in the treated effluent, which is considered to be the Limit of Technology. Improvements to the plant must be achieved on a strict schedule imposed by a consent order.

Document Type: Research Article

DOI: http://dx.doi.org/10.2175/193864705783812873

Publication date: January 1, 2005

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access.
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • ingentaconnect is not responsible for the content or availability of external websites
wef/wefproc/2005/00002005/00000006/art00015
dcterms_title,dcterms_description,pub_keyword
6
5
20
40
5

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
ingentaconnect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more