COST ANALYSIS OF MBR SYSTEMS FOR WATER RECLAMATION

$17.50 plus tax (Refund Policy)

Buy Article:

Abstract:

Cost estimates were developed for full-scale MBR reclamation systems ranging from 0.2-10 MGD. These estimates included both capital and operational costs related to the MBR process and subsequent disinfection. The costs associated with the membrane portion of the MBR systems were developed from cost quotes from four leading MBR suppliers. All other costs including headworks, biological process and disinfection costs were estimated from preliminary conceptual design. Results of the analysis showed total costs (/1000 gal) for 1-MGD MBR water reclamation systems, designed to operate on raw wastewater, ranged from 1.81-2.24. Cost estimates (/1000 gal) for 1-MGD MBR water reclamation systems designed to operate on advanced primary effluent ranged from 1.48-1.91.

Document Type: Research Article

DOI: http://dx.doi.org/10.2175/193864704784131383

Publication date: January 1, 2004

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access.
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • ingentaconnect is not responsible for the content or availability of external websites

Tools

Favourites

Share Content

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
ingentaconnect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more