@article {Gribbon:2003:1938-6478:724, author = "Gribbon, Paul and Irwin, Gary and Boyce, Glenn and Colzani, Greg and McDonald, Jim", title = "AN ALTERNATIVE PROJECT DELIVERY APPROACH FOR THE CITY OF PORTLANDS WEST SIDE COMBINED SEWER OVERFLOW PROGRAM", journal = "Proceedings of the Water Environment Federation", volume = "2003", number = "12", year = "2003", abstract = "This paper discusses the process utilized by the City of Portland Oregon's Bureau of Environmental Services (BES) to procure and compensate Impregilo-SA Healy (I'H) for the West Side Willamette River Combined Sewer Overflow (CSO) Project. The contract method is a three-phase process consisting of qualifications based contractor procurement, pre-construction phase design assistance'construction planning, and facility construction where the contractor is compensated on a cost reimbursable-fixed fee basis. The paper focuses on pre-construction phase lessons learned from the development of the contract general conditions, establishment of a construction budget and cost control program, incorporation of contractor recommended design changes, and development of a subcontractor procurement program for construction.", pages = "724-744", url = "http://www.ingentaconnect.com/content/wef/wefproc/2003/00002003/00000012/art00045", doi = "doi:10.2175/193864703784755021" }