Skip to main content

THE CHALLENGES OF WASTEWATER TREATMENT ON AN ISLAND PARADISE – THE BERMUDA EXPERIENCE

The full text article is not available for purchase.

The publisher only permits individual articles to be downloaded by subscribers.

or click here to sign up for a free trial

Abstract:

Bermuda, an island of about 60,000 residents, is located in the mid-Atlantic. The City of Hamilton is the main urban center on the island and the hub of tourist and commercial activities. The wastewater management system, originally commissioned in 1920, collects wastewater to a central point near the harbor and pumps it to the open ocean on the south coast of the island.

With the aging of the existing system and the need to look at long-term wastewater management needs, the Corporation embarked on a series of oceanographic and engineering studies in the early 1990s. This resulted in the development of a two-stage wastewater treatment and disposal strategy. In the short-term, the existing comminution and pumping station would be replaced with a new wastewater treatment facility utilizing fine screening technology. In the long-term, depending upon growth and environmental impact, the strategy will see an upgrade in the level of treatment to either enhanced primary or secondary treatment and an extended, directionaldrilled outfall, that would discharge beyond the outer reef.

The key objectives of the first stage were to remove floatables from the wastewater, reduce the amount of grease being discharged from the ocean outfall, and improve the overall reliability of the wastewater management system. Considering the prominent location of the new facility - literally across the street from retail shops - other key considerations included controlling odors, managing noise levels, limiting disruptions during the routine operation of the plant, and providing an architectural design that would blend the new building into the surroundings.

The Front Street Wastewater Treatment Plant, commissioned in January 2002, consists of a single, multi-storied building designed in a classic Bermudian Style. Two perforated plate fine screens, with 6 mm openings, screen the wastewater coming into the treatment plant. The bagged screenings are regularly loaded onto a covered truck, within the confines of the building, and are brought to the Government of Bermuda solid waste incinerator for destruction.

Document Type: Research Article

DOI: http://dx.doi.org/10.2175/193864702784246919

Publication date: January 1, 2002

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access.
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • Ingenta Connect is not responsible for the content or availability of external websites
wef/wefproc/2002/00002002/00000016/art00061
dcterms_title,dcterms_description,pub_keyword
6
5
20
40
5

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more