Orange County Public Utilities (OCU) operates a large, complex wastewater system consisting of three advanced wastewater treatment plants and over 500 lift stations. For over 20 years, central Florida has experienced rapid, sustained growth. As the wastewater utility expanded to accommodate this growth, the process control and SCADA systems had become a mixture of technologies and were under-utilized.

OCU embarked on a series of optimization initiatives aimed at curbing cost increases. Management realized that proper use of control system technologies provided a means to control treatment plant operation and maintenance costs. Proper SCADA system deployment would provide a mechanism for minimizing SSO events and quickly responding to spills, should they occur. OCU established a set of objectives for an enhanced process control/SCADA system: 1) automate the operation of the treatment facilities to support a reduced level of operations staff; 2) simplify maintenance of the control systems; 3) provide the same look and feel at each treatment facility and for the lift station control system; 4) provide a reliable, high speed, method to interconnect the plants thereby allowing the monitoring and control of any plant or the lift stations from any other plant; 5) minimize spare parts inventory; and 6) build the system using nonproprietary hardware and software.

In 1998, OCU commissioned the development of a process control and SCADA system master plan. Several technical and project delivery alternatives for meeting the objectives outlined above were evaluated. A systematic, phased implementation approach was developed. It defined a six-year plan to install the lift station SCADA system and upgrade the process control systems at each of three treatment plants. Total cost for the systems was estimated at about 16 million.

During the planning phase, the two largest treatment plants were to undergo significant expansions. The South Plant is experiencing a series of expansions estimated to cost nearly 100 million using a design-build process. The Eastern Plant will undergo an expansion estimated to cost 3 million using a standard design-bid-build procedure. The lift station SCADA system was implemented using a design-build process with a firm bid. To accommodate the goal of a standardized approach to software development and to provide consistency and compatibility between facilities, OCU retained a process control system (PCS) program management firm. This firm interfaced with the design builders, the consulting engineers, and the contractors to assure a consistent approach. Contractors were responsible for system software; the program management firm was responsible for applications software.

A single entity responsible to assure consistency and compatibility between all facilities is possible and beneficial despite the project delivery mechanism changing from plant to plant.

Document Type: Research Article

DOI: http://dx.doi.org/10.2175/193864702784246694

Publication date: January 1, 2002

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access.
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • ingentaconnect is not responsible for the content or availability of external websites
wef/wefproc/2002/00002002/00000016/art00030
dcterms_title,dcterms_description,pub_keyword
6
5
20
40
5

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
ingentaconnect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more