THE CONVERSATION THE CONSULTING ENGINEER AND THE UTILITY MANAGER OUGHT TO HAVE: WHAT DOES GETTING MORE FOR LESS MEAN?

Buy Article:

$17.50 plus tax (Refund Policy)

Or sign up for a free trial

Abstract:

In an era of greater expectations from the public for greater efficiency in utility operations, managers are examining all aspects of their operation, including their relationships with consultants. When expecting “more for less” from their own staff and infrastructure, it is not surprising that some of them are carrying that demand to consultants. But what does “more” mean and what does “less” mean? These are important definitions to come to common understanding about.

First and foremost, the competitiveness issue is not the only trend that should be important to both managers and engineers, as technology has significantly evolved over the last three decades. The example chosen for this paper is wastewater treatment technology. Technology changes include the level of understanding of unit process performance, moving from rules of thumb to process models, as well as the type of financing available (grants to self-financing) that have had a marked impact on project development. Also, the level of innovation has been remarkable, with significant capital cost savings; information technology has unlocked the usefulness of all kinds of data to utility managers. Taking advantage of these trends has got to be an important element of getting “more.”

When initiating capital projects, the manager must estimate both the cost of the construction and the cost of the engineering. But which is the important cost? Is it the cost of construction, the cost of engineering and related administrative costs, or the total cost of the project? And how is the quality of the project defined (the “more” issue)? Utility managers and consulting engineers are often put at odds during the critical project initiation phase. At this time the manager often wants to show to governing bodies that the engineer's costs have been contained while the engineer wants to develop the project concept through additional investigation, but may be forced to forego this in the competitive selection process. Focusing on the cost of the total project is the answer to this initial project imbalance. Not finding balance here may result in finding truth in the old saying that “there is nothing more expensive than cheap engineering.”

Document Type: Research Article

DOI: https://doi.org/10.2175/193864702784248124

Publication date: 2002-01-01

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    A subscription to the Proceedings of the Water Environment Federation includes access to most papers presented at the annual WEF Technical Exhibition and Conference (WEFTEC) and other conferences held since 2000. Subscription access begins 12 months after the event and is valid for 12 months from month of purchase. A subscription to the Proceedings of the Water Environment Federation is included in Water Environment Federation (WEF) membership.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access. Access begins 12 months after the conference or event
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • Learn about the many other WEF member benefits and join today
  • Ingenta Connect is not responsible for the content or availability of external websites
  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more