Skip to main content

The Iron Bridge Bardenpho System … A Great Process Made Better!

Buy Article:

$17.50 plus tax (Refund Policy)

Or sign up for a free trial


The project goal was to identify and obtain the maximum treatment capacity of the existing Bardenpho process to treat flows significantly above the original design value.

The Bardenpho process modification project has allowed the decommissioning of the City's failing Rotating Biological Contactor (RBC) process without a reduction in the facility's permitted treatment capacity. The City's anticipated savings in averted capital for new process tankage, to replace the lost RBC permitted capacity of 16 mgd, exceeds 40 million dollars.

Document Type: Research Article


Publication date: January 1, 2002

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access.
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • ingentaconnect is not responsible for the content or availability of external websites

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
Cookie Policy
ingentaconnect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more
Real Time Web Analytics