Skip to main content

A Trenchless Solution to a Difficult Situation: R.M. Clayton WRC Interceptor Tunnel

Buy Article:

$17.50 plus tax (Refund Policy)

Or sign up for a free trial

Abstract:

The City of Atlanta has embarked on a major expansion of the R. M. Clayton Water Reclamation Center (WRC) to comply with Georgia Environmental Protection Department (EPD) requirements for effluent phosphorus limits. Part of the expansion includes new headworks with coarse and fine screening and a new conveyance system to connect the new headworks to the existing primary clarifier influent channel.

Document Type: Research Article

DOI: https://doi.org/10.2175/193864701790902798

Publication date: 2001-01-01

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access.
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • Ingenta Connect is not responsible for the content or availability of external websites
  • Access Key
  • Free ContentFree content
  • Partial Free ContentPartial Free content
  • New ContentNew content
  • Open Access ContentOpen access content
  • Partial Open Access ContentPartial Open access content
  • Subscribed ContentSubscribed content
  • Partial Subscribed ContentPartial Subscribed content
  • Free Trial ContentFree trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more