ESTIMATING THE EXTENT OF I/I IN EPA REGION 4 USING NPDES MONITORING REPORTS

$17.50 plus tax (Refund Policy)

Buy Article:

Abstract:

The purpose of this study is to evaluate the US EPA's PCS (Permit Compliance System) database and determine various parameters that may be useful in developing I/I control and sewer rehabilitation strategies on a state and regional level. This study summarizes DMRs (monthly NPDES Discharge Monitoring Reports) for the 12 months of 1999 from 790 systems categorized as “major” by the various authorities in the eight states comprising Region 4. Generally, that category refers to plants with a hydraulic design capacity greater than 3,750 m3/day (1 mgd).

Document Type: Research Article

DOI: http://dx.doi.org/10.2175/193864701790860803

Publication date: January 1, 2001

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access.
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • ingentaconnect is not responsible for the content or availability of external websites

Tools

Favourites

Share Content

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
ingentaconnect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more