Skip to main content

CITY OF ATLANTA'S REENGINEERING AND CONTRACT OPERATIONS PROGRAM

Buy Article:

$9.50 plus tax (Refund Policy)

Or sign up for a free trial

In early 1997, the City of Atlanta was faced with an 80 percent sewer rate increase to fund a Capital Improvement Program in excess of 1 billion. Mayor Bill Campbell directed that a full range of cost reduction options be evaluated to mitigate the rate increase. A comprehensive assessment of the City's entire water and wastewater operations was conducted and a range of internal and external management approaches were considered. After reviewing the alternatives, the Mayor announced his plan which consisted of a combination of approaches: contract operation of the entire Water System, contract operation of the largest wastewater treatment plant, and reengineering of the other City wastewater and sewer operations.

Since the City launched this aggressive reengineering and contract operations program, all parts of the Mayor's plan have been successfully implemented or have been initiated. Contract operation of the Water System has been in place since January 1, 1999. The Atlanta reengineering plan for the Sewer System was developed in 1999 and a 5-year implementation plan is underway. Due to several factors and events, the City shifted from a plan for contract operation of the largest wastewater treatment plant to implementation of a design-build-operate contract for handling biosolids at all three of the City's wastewater treatment plants.

This paper provides an update of the City's reengineering and contract operations program 4 years after it was initiated.
No Reference information available - sign in for access.
No Citation information available - sign in for access.
No Supplementary Data.
No Data/Media
No Metrics

Document Type: Research Article

Publication date: 2001-01-01

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    A subscription to the Proceedings of the Water Environment Federation includes access to most papers presented at the annual WEF Technical Exhibition and Conference (WEFTEC) and other conferences held since 2000. Subscription access begins 12 months after the event and is valid for 12 months from month of purchase. A subscription to the Proceedings of the Water Environment Federation is included in Water Environment Federation (WEF) membership.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access. Access begins 12 months after the conference or event
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • Learn about the many other WEF member benefits and join today
  • Ingenta Connect is not responsible for the content or availability of external websites
  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more