OPTIMIZATION OF FINAL CLARIFIER DESIGN

$17.50 plus tax (Refund Policy)

Buy Article:

Abstract:

The final clarifiers at WASA's 370 mgd Blue Plains Wastewater Treatment Plant are in the process of being renovated and upgraded. As part of this project, the clarifiers are being optimized with respect to inlet design, the addition of intra-basin baffling, and sludge withdrawal. A 3-step procedure involving detailed hydraulic analysis (i.e., CFD analysis) and field data collection was used to develop and test design upgrades. This balanced approach to facilities upgrade produced a detailed understanding of process hydraulics, and enabled the design of modifications uniquely suited for the final clarifiers at the Blue Plains Wastewater Treatment Plant.

Document Type: Research Article

DOI: http://dx.doi.org/10.2175/193864700784607550

Publication date: January 1, 2000

More about this publication?
  • Proceedings of the Water Environment Federation is an archive of papers published in the proceedings of the annual Water Environment Federation® Technical Exhibition and Conference (WEFTEC® ) and specialty conferences held since the year 2000. These proceedings are not peer reviewed.

    WEF Members: Sign in (right panel) with your IngentaConnect user name and password to receive complimentary access.
  • Subscribe to this Title
  • Membership Information
  • About WEF Proceedings
  • WEFTEC Conference Information
  • ingentaconnect is not responsible for the content or availability of external websites

Tools

Favourites

Share Content

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
ingentaconnect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more