Skip to main content

Publisher: Taylor and Francis Ltd

Volume 36, Number 1, January 2004

Some results on resource constrained scheduling
pp. 1-9(9)
Authors: ZHANG, GUOCHUAN; CAI, XIAOQIANG; WONG, C.

Favourites:
ADD

Parallel machine scheduling to minimize the sum of quadratic completion times
pp. 11-17(7)
Authors: EDWIN CHENG, T.; LIU, ZHAOHUI

Favourites:
ADD
Favourites:
ADD

Optimal capacity expansion for multi-product, multi-machine manufacturing systems with stochastic demand
pp. 23-36(14)
Authors: ZHANG, FENG; ROUNDY, ROBIN; ÇAKANYILDIRIM, METIN; HUH, WOONGHEE

Favourites:
ADD

Exact algorithms for the job sequencing and tool switching problem
pp. 37-45(9)
Authors: LAPORTE, GILBERT; SALAZAR-GONZÁLEZ, JUAN; SEMET, FRÉDÉRIC

Favourites:
ADD

An industrial extension of the discrete lot-sizing and scheduling problem
pp. 47-58(12)
Authors: JANS, RAF; DEGRAEVE, ZEGER

Favourites:
ADD

Multi-product inventory planning with downward substitution, stochastic demand and setup costs
pp. 59-71(13)
Authors: RAO, UDAY; SWAMINATHAN, JAYASHANKAR; ZHANG, JUN

Favourites:
ADD
Favourites:
ADD

Batching in a two-stage flowshop with dedicated machines in the second stage
pp. 87-93(7)
Authors: CHENG, T.; KOVALYOV, M.; CHAKHLEVICH, K.

Favourites:
ADD

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more