Skip to main content

Publisher: Taylor and Francis Ltd

More about this publication?
Volume 51, Number 3, 1 February 2013

Favourites:
ADD

Synergy of ICA and MCDM for multi‐response optimisation problems
pp. 652-666(15)
Authors: Fallah‐Jamshidi, Saeid; Amiri, Maghsoud

Favourites:
ADD

A multi-objective optimisation algorithm for the hot rolling batch scheduling problem
pp. 667-681(15)
Authors: Jia, S.J.; Yi, J.; Yang, G.K.; Du, B.; Zhu, J.

Favourites:
ADD

An adaptive genetic algorithm for large-size open stack problems
pp. 682-697(16)
Authors: De Giovanni, L.; Massi, G.; Pezzella, F.

Favourites:
ADD
Favourites:
ADD

A mixed integer programming model for a closed-loop supply-chain network
pp. 718-734(17)
Authors: Özceylan, Eren; Paksoy, Turan

Favourites:
ADD

A heuristic algorithm for two-stage flexible flow shop scheduling with head group constraint
pp. 751-771(21)
Authors: Li, Zhan-tao; Chen, Qing-xin; Mao, Ning

Favourites:
ADD

Flow shop rescheduling under different types of disruption
pp. 780-797(18)
Authors: Katragjini, Ketrina; Vallada, Eva; Ruiz, Rubén

Favourites:
ADD
Favourites:
ADD

Looking for the best modes helps solving the MRCPSP/max
pp. 813-827(15)
Authors: Ballestín, Francisco; Barrios, Agustín; Valls, Vicente

Favourites:
ADD

Single-item production–delivery scheduling problem with stage-dependent inventory costs and due-date considerations
pp. 828-846(19)
Authors: Wang, Deyun; Grunder, Olivier; El Moudni, Abdellah

Favourites:
ADD

Workload control and order release in two-level multi-stage job shops: an assessment by simulation
pp. 869-882(14)
Authors: Thürer, Matthias; Stevenson, Mark; Silva, Cristovao; Land, Martin; Filho, Moacir Godinho

Favourites:
ADD
Favourites:
ADD

Integrated scheduling of production and delivery with time windows
pp. 897-909(13)
Authors: Low, Chinyao; Li, Rong-Kwei; Chang, Chien-Min

Favourites:
ADD

Batch scheduling problem for a machinery factory with fixed-position layout
pp. 910-926(17)
Authors: Lin, Rock; Liao, Ching-Jong

Favourites:
ADD

A combined dispatching criteria approach to scheduling dual flow-shops
pp. 927-939(13)
Authors: Chiou, Chie-Wun; Chen, Wen-Min; Wu, Muh-Cherng

Favourites:
ADD

Task assignment considering cross-training goals and due dates
pp. 952-962(11)
Authors: Olivella, Jordi; Corominas, Albert; Pastor, Rafael

Favourites:
ADD

  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more