Skip to main content

Publisher: Taylor and Francis Ltd

More about this publication?
Volume 50, Number 20, 15 October 2012

Favourites:
ADD

A genetic algorithm approach for production scheduling with mould maintenance consideration
pp. 5683-5697(15)
Authors: Wong, C.S.; Chan, F.T.S.; Chung, S.H.

Favourites:
ADD

A modified ant-colony optimisation algorithm to minimise the completion time variance of jobs in flowshops
pp. 5698-5706(9)
Authors: Krishnaraj, J.; Pugazhendhi, S.; Rajendran, C.; Thiagarajan, S.

Favourites:
ADD

Production planning for a ramp-up process with learning in production and growth in demand
pp. 5707-5718(12)
Authors: Glock, Christoph H.; Jaber, Mohamad Y.; Zolfaghari, Saeed

Favourites:
ADD

Optimal vehicle allocation for an Automated Materials Handling System using simulation optimisation
pp. 5734-5746(13)
Authors: Huang, Chao-Jung; Chang, Kuo-Hao; Lin, James T.

Favourites:
ADD

Improved variable neighbourhood search for integrated tundish planning in primary steelmaking processes
pp. 5747-5761(15)
Authors: Dong, Hongyu; Huang, Min; Ip, W.H.; Wang, Xingwei

Favourites:
ADD

Divergent production scheduling with multi-process routes and common inventory
pp. 5762-5782(21)
Authors: Luo, Hao; Huang, George Q.; Shi, Yuan; Qu, Ting

Favourites:
ADD
Favourites:
ADD

A large-scale distributed decision-making procedure for a single-machine scheduling problem
pp. 5795-5808(14)
Authors: Hong, Soondo; Banerjee, Amarnath

Favourites:
ADD

Asynchronous teams for joint lot-sizing and scheduling problem in flow shops
pp. 5809-5822(14)
Authors: Filho, Márcio A.F. Belo; Santos, Maristela O.; Meneses, Cláudio N.

Favourites:
ADD

Setup-oriented dispatching rules – a survey
pp. 5823-5842(20)
Authors: Pickardt, Christoph W.; Branke, Jürgen

Favourites:
ADD

Sequence-dependent flow shop scheduling problem minimising the number of tardy jobs
pp. 5843-5858(16)
Authors: Varmazyar, Mohsen; Salmasi, Nasser

Favourites:
ADD

Optimal maintenance schedule decisions for machine tools considering the user's cost structure
pp. 5859-5871(13)
Authors: Lad, Bhupesh Kumar; Kulkarni, Makarand S.

Favourites:
ADD

A hybrid genetic algorithm for the single row layout problem
pp. 5872-5886(15)
Author: Ozcelik, Feristah

Favourites:
ADD
Favourites:
ADD

A reliability/availability approach to joint production and maintenance scheduling with multiple preventive maintenance services
pp. 5906-5925(20)
Authors: Mokhtari, Hadi; Mozdgir, Ashkan; Kamal Abadi, Isa Nakhai

Favourites:
ADD
Favourites:
ADD

A review and evaluation on constructive heuristics to optimise product mix based on the Theory of Constraints
pp. 5936-5948(13)
Authors: Sobreiro, Vinicius Amorim; Nagano, Marcelo Seido

Favourites:
ADD

The performance of Due Date setting rules in assembly and multi-stage job shops: an assessment by simulation
pp. 5949-5965(17)
Authors: Thürer, Matthias; Huang, George; Stevenson, Mark; Silva, Cristovao; Filho, Moacir Godinho

Favourites:
ADD
Favourites:
ADD

Scheduling dynamic block assembly in shipbuilding through hybrid simulation and spatial optimisation
pp. 5986-6004(19)
Authors: Zhuo, Liu; Chua Kim Huat, David; Wee, Keng Hwee

Favourites:
ADD

Makespan minimisation on parallel batch processing machines with non-identical job sizes and release dates
pp. 6022-6035(14)
Authors: Ozturk, Onur; Espinouse, Marie-Laure; Mascolo, Maria Di; Gouin, Alexia

Favourites:
ADD

Fast and meta-heuristics for common due-date assignment and scheduling on parallel machines
pp. 6040-6057(18)
Authors: Kim, Jun-Gyu; Kim, Ji-Su; Lee, Dong-Ho

Favourites:
ADD

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more