Skip to main content

Publisher: Taylor and Francis Ltd

More about this publication?
Volume 48, Number 12, January 2010

Favourites:
ADD

Layout design with hexagonal floor plans and material flow patterns
pp. 3407-3428(22)
Authors: Chung, J.; Tanchoco, J. M. A.

Favourites:
ADD

A criterion of production model selection for building material with delivery delay
pp. 3429-3443(15)
Authors: Cao, De-bi; Yin, Yong; Kaku, Ikou

Favourites:
ADD

SWMRD: a Semantic Web-based manufacturing resource discovery system for cross-enterprise collaboration
pp. 3445-3460(16)
Authors: Cai, M.; Zhang, W. Y.; Chen, G.; Zhang, K.; Li, S. T.

Favourites:
ADD

Multistage PRIM: patient rule induction method for optimisation of a multistage manufacturing process
pp. 3461-3473(13)
Authors: Kwak, Doh-Soon; Kim, Kwang-Jae; Lee, Myeong-Soo

Favourites:
ADD

Make to stock and mix to order: choosing intermediate products in the food-processing industry
pp. 3475-3492(18)
Authors: Akkerman, Renzo; van der Meer, Dirk; van Donk, Dirk Pieter

Favourites:
ADD
Favourites:
ADD

Incorporating dynamism in traditional machine loading problem: an AI-based optimisation approach
pp. 3535-3559(25)
Authors: Mandal, Santosh Kumar; Pandey, Mayank Kumar; Tiwari, M. K.

Favourites:
ADD

Scheduling and order acceptance for the customised stochastic lot scheduling problem
pp. 3561-3578(18)
Authors: van Foreest, Nicky; Wijngaard, Jacob; van der Vaart, Taco

Favourites:
ADD

Part-machine cell formation in group technology using a simulated annealing-based meta-heuristic
pp. 3579-3591(13)
Authors: Lin, Shih-Wei; Ying, Kuo-Ching; Lee, Zne-Jung

Favourites:
ADD

Workload control release mechanisms: from practice back to theory building
pp. 3593-3617(25)
Authors: Thurer, Matthias; Silva, Cristovao; Stevenson, Mark

Favourites:
ADD

Manufacturing lot-sizing, procurement and delivery schedules over a finite planning horizon
pp. 3619-3636(18)
Authors: Mungan, Deniz; Yu, Junfang; Sarker, Bhaba

Favourites:
ADD
Favourites:
ADD
Favourites:
ADD
Favourites:
ADD

An analysis of the ceiling height requirement for a large-scale semiconductor fab
pp. 3697-3706(10)
Authors: Wu, Muh-Cherng; Shih, Chang-Fu; Chen, Chen-Fu

Favourites:
ADD
Favourites:
ADD
Favourites:
ADD
Favourites:
ADD

  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more