Publisher: Taylor and Francis Ltd

More about this publication?
Related content
Volume 48, Number 12, January 2010

< previous issue | all issues | next issue >

Favourites:Add to Favourites
Favourites:Add to Favourites

Layout design with hexagonal floor plans and material flow patterns
pp. 3407-3428(22)
Authors: Chung, J.; Tanchoco, J. M. A.

Favourites:Add to Favourites

A criterion of production model selection for building material with delivery delay
pp. 3429-3443(15)
Authors: Cao, De-bi; Yin, Yong; Kaku, Ikou

Favourites:Add to Favourites

SWMRD: a Semantic Web-based manufacturing resource discovery system for cross-enterprise collaboration
pp. 3445-3460(16)
Authors: Cai, M.; Zhang, W. Y.; Chen, G.; Zhang, K.; Li, S. T.

Favourites:Add to Favourites

Multistage PRIM: patient rule induction method for optimisation of a multistage manufacturing process
pp. 3461-3473(13)
Authors: Kwak, Doh-Soon; Kim, Kwang-Jae; Lee, Myeong-Soo

Favourites:Add to Favourites

Make to stock and mix to order: choosing intermediate products in the food-processing industry
pp. 3475-3492(18)
Authors: Akkerman, Renzo; van der Meer, Dirk; van Donk, Dirk Pieter

Favourites:Add to Favourites
Favourites:Add to Favourites

Incorporating dynamism in traditional machine loading problem: an AI-based optimisation approach
pp. 3535-3559(25)
Authors: Mandal, Santosh Kumar; Pandey, Mayank Kumar; Tiwari, M. K.

Favourites:Add to Favourites

Scheduling and order acceptance for the customised stochastic lot scheduling problem
pp. 3561-3578(18)
Authors: van Foreest, Nicky; Wijngaard, Jacob; van der Vaart, Taco

Favourites:Add to Favourites

Part-machine cell formation in group technology using a simulated annealing-based meta-heuristic
pp. 3579-3591(13)
Authors: Lin, Shih-Wei; Ying, Kuo-Ching; Lee, Zne-Jung

Favourites:Add to Favourites

Workload control release mechanisms: from practice back to theory building
pp. 3593-3617(25)
Authors: Thurer, Matthias; Silva, Cristovao; Stevenson, Mark

Favourites:Add to Favourites

Manufacturing lot-sizing, procurement and delivery schedules over a finite planning horizon
pp. 3619-3636(18)
Authors: Mungan, Deniz; Yu, Junfang; Sarker, Bhaba

Favourites:Add to Favourites
Favourites:Add to Favourites
Favourites:Add to Favourites
Favourites:Add to Favourites

An analysis of the ceiling height requirement for a large-scale semiconductor fab
pp. 3697-3706(10)
Authors: Wu, Muh-Cherng; Shih, Chang-Fu; Chen, Chen-Fu

Favourites:Add to Favourites
Favourites:Add to Favourites
Favourites:Add to Favourites

Share Content

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
ingentaconnect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more