Skip to main content

Publisher: Taylor and Francis Ltd

More about this publication?
Volume 48, Number 8, January 2010

Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups
pp. 2169-2184(16)
Authors: Ying, Kuo-Ching; Gupta, Jatinder; Lin, Shih-Wei; Lee, Zen-Jung

Favourites:
ADD

Analysis of operator-machine configuration for single and multi-processor machines
pp. 2185-2200(16)
Authors: Daniel Sheu, D.; Hsueh, Jack

Favourites:
ADD

Estimating printed circuit board assembly times using neural networks
pp. 2201-2218(18)
Authors: Vainio, Frans; Maier, Michael; Knuutila, Timo; Alhoniemi, Esa; Johnsson, Mika; Nevalainen, Olli

Favourites:
ADD

A data-driven manufacturing support system for rubber extrusion lines
pp. 2219-2231(13)
Authors: Cabrera, Claudia Barreto; Ordieres Mere, Joaquin B.; Castejon Limas, Manuel; Jose del Coz Diaz, Juan

Favourites:
ADD

Impact of the use-based maintenance policy on the performance of cellular manufacturing systems
pp. 2233-2260(28)
Authors: Safaei, Nima; Banjevic, Dragan; Jardine, Andrew

Favourites:
ADD

Development of an AI-based Rapid Manufacturing Advice System
pp. 2261-2278(18)
Authors: Munguia, Javier; Lloveras, Joaquim; Llorens, Sonia; Laoui, Tahar

Favourites:
ADD

Optimising lot sizing and order scheduling with non-linear production rates
pp. 2279-2295(17)
Authors: Neidigh, Robert; Harrison, Terry

Favourites:
ADD

Performance measurement in supply chains: new network analysis and entropic indexes
pp. 2297-2321(25)
Authors: Allesina, S.; Azzi, A.; Battini, D.; Regattieri, A.

Favourites:
ADD

A hybrid GA-simulation approach to improve JIT systems
pp. 2323-2344(22)
Authors: Azadeh, A.; Ebrahimipour, V.; Bavar, P.

Favourites:
ADD

Workload balancing capability of pull systems in MTO production
pp. 2345-2360(16)
Authors: Germs, R.; Riezebos, J.

Favourites:
ADD

Automatic bubble defect inspection for microwave communication substrates using multi-threshold technique based co-occurrence matrix
pp. 2361-2371(11)
Authors: Jiang, Bernard; Wang, Chien-Chih; Chen, Hsin-Ju; Chu, Chien-Cheng

Favourites:
ADD

An on-time delivery improvement model for manufacturing organisations
pp. 2373-2394(22)
Authors: Karim, M. A.; Samaranayake, P.; Smith, A. J. R.; Halgamuge, S. K.

Favourites:
ADD

Order timing strategies in a single-supplier, multi-retailer system
pp. 2395-2412(18)
Authors: Bakal, Ismail Serdar; Geunes, Joseph

Favourites:
ADD

A new computational method for MAT of injected parts integrated in part modelling stage
pp. 2431-2447(17)
Authors: Petrovic, Vojislav; Rosado, Pedro; Torres, Rafael

Favourites:
ADD

Dynamic job shop scheduling using variable neighbourhood search
pp. 2449-2458(10)
Authors: Zandieh, M.; Adibi, M. A.

Favourites:
ADD

A hierarchical process monitoring strategy for a serial multi-stage manufacturing system
pp. 2459-2479(21)
Authors: Das, A.; Maiti, J.; Banerjee, R. N.

Favourites:
ADD

  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more