Skip to main content

Publisher: Taylor and Francis Ltd

More about this publication?
Volume 47, Number 20, January 2009

Redesign of production flow lines to postpone product differentiation
pp. 5563-5590(28)
Authors: Al-Salim, Bashar; Choobineh, F.

Favourites:
ADD

Permutation flow shop scheduling with earliness and tardiness penalties
pp. 5591-5610(20)
Authors: Chandra, Pankaj; Mehta, Peeyush; Tirupati, Devanath

Favourites:
ADD

A genetic algorithm and queuing theory based methodology for facilities layout problem
pp. 5611-5635(25)
Authors: Raman, Dhamodharan; Nagalingam, Sev; Gurd, Bruce

Favourites:
ADD

Development of a collaborative product development framework based on centre-satellite system and service-oriented architecture
pp. 5637-5656(20)
Authors: Wang, Tsung-Li; Fang, Lung-Ching; Wu, Wen-Hsiung; Ho, Chin-Fu

Favourites:
ADD

A generic deadlock-free reactive scheduling approach
pp. 5657-5676(20)
Authors: Fahmy, Sherif; Balakrishnan, Subramaniam; ElMekkawy, Tarek

Favourites:
ADD

Focused SWOT: diagnosing critical strengths and weaknesses
pp. 5677-5689(13)
Authors: Coman, Alex; Ronen, Boaz

Favourites:
ADD

Manipulator motion planning for high-speed robotic laser cutting
pp. 5691-5715(25)
Authors: Dolgui, Alexandre; Pashkevich, Anatol

Favourites:
ADD
Favourites:
ADD

The influence of multi-product production strategy on factory induced bullwhip
pp. 5739-5759(21)
Authors: Potter, Andrew; Towill, Denis; Bohme, Tillmann; Disney, Stephen

Favourites:
ADD
Favourites:
ADD

Assessing the effectiveness of supply flexibility sources: an empirical research
pp. 5791-5809(19)
Authors: Tachizawa, Elcio; Gimenez, Cristina

Favourites:
ADD

Minimising total cost with regular and emergency outsourcing sources: a neuro-dynamic programming approach
pp. 5811-5827(17)
Authors: Dhawan, Aayush; Srinivasan, Samashivan; Rajib, Prabina; Bidanda, Bopaya

Favourites:
ADD

Composition of module stock for final assembly using an enhanced genetic algorithm
pp. 5829-5842(14)
Authors: Agard, Bruno; da Cunha, Catherine; Cheung, Bernard

Favourites:
ADD

Route planning for two wafer fabs with capacity-sharing mechanisms
pp. 5843-5856(14)
Authors: Wu, Muh-Cherng; Chen, Chen-Fu; Shih, Chang-Fu

Favourites:
ADD

Revising the master production schedule in a HPP framework context
pp. 5857-5878(22)
Authors: Omar, M. K.; Bennell, J. A.

Favourites:
ADD

  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content