Skip to main content

Publisher: Taylor and Francis Ltd

More about this publication?
Volume 45, Number 14, July 2007

Vendor selection in a modified re-buy situation using a strategy-aligned fuzzy approach
pp. 3113-3133(21)
Authors: Chou, S.-Y.; Shen, C.-Y.; Chang, Y.-H.

Favourites:
ADD

An empirical examination of response time, product variety and firm performance
pp. 3135-3150(16)
Authors: Zhang, Xiang; Chen, Rongqiu; Ma, Yubo

Favourites:
ADD
Favourites:
ADD

An optimal batch size for an imperfect production system with quality assurance and rework
pp. 3191-3214(24)
Authors: Ojha, D.; Sarker, B. R.; Biswas, P.

Favourites:
ADD
Favourites:
ADD

Using dispatching rules for job shop scheduling with due date-based objectives
pp. 3245-3262(18)
Authors: Chiang, T. C.; Fu, L. C.

Favourites:
ADD

A case study in productivity-cost trade-off in the design of paced parallel production systems
pp. 3263-3288(26)
Authors: Freiheit, T.; Wang, W.; Spicer, Patrick

Favourites:
ADD

Tolerance transfer in sheet metal forming
pp. 3289-3309(21)
Authors: Thimm, Georg; Rui, Wang; Yongsheng, Ma

Favourites:
ADD

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more