Skip to main content

Publisher: Taylor and Francis Ltd

More about this publication?
Volume 44, Number 2, Number 2/15 January 2006

The trade-off between stability and makespan in resource-constrained project scheduling
pp. 215-236(22)
Authors: Van De Vonder, S.; Demeulemeester, E.; Herroelen, W.; Leus, R.

Favourites:
ADD

Repeat inspection planning using dynamic programming
pp. 257-270(14)
Authors: Elshafei, M.; Khan, M.; Duffuaa, S. O.

Favourites:
ADD

Rapid video-based analysis system for advanced work measurement
pp. 271-290(20)
Authors: Elnekave, M.; Gilad, I.

Favourites:
ADD
Favourites:
ADD

Model for cost estimation in a finite-capacity environment
pp. 305-327(23)
Authors: Feldman, P.; Shtub, A.

Favourites:
ADD

Web-based configuration design system for product customization
pp. 351-382(32)
Authors: Ong, S. K.; Lin, Q.; Nee, A. Y. C.

Favourites:
ADD

More on ‘Models and algorithms for the dynamic-demand joint replenishment problem'
pp. 383-397(15)
Authors: Narayanan, A.; Robinson, E. P.

Favourites:
ADD

Material requirements planning with flexible bills-of-material
pp. 399-415(17)
Authors: Ram, Bala; Naghshineh-Pour, M. Reza; Yu†, Xuefeng

Favourites:
ADD

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
ingentaconnect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more