Skip to main content

Publisher: Taylor and Francis Ltd

More about this publication?
Volume 43, Number 11, Number 11/1 June 2005

Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop
pp. 2149-2167(19)
Authors: Choi, S.-W.; Kim, Y.-D.; Lee, G.-C.

Favourites:
ADD

A comparison of focused cellular manufacturing to cellular manufacturing and job shop
pp. 2169-2194(26)
Authors: Canel, C.; Al-Mubarak, F.; Khumawala, B. M.

Favourites:
ADD
Favourites:
ADD

Optimal design methodologies for configuration of supply chains
pp. 2217-2236(20)
Authors: Truong, T. H.; Azadivar, F.

Favourites:
ADD

The performance of the number of vehicles in a dynamic connecting transport AMHS
pp. 2263-2276(14)
Authors: Lin, J. T.; Wang, F. K.; Yang, C. J.

Favourites:
ADD

Qualitative modelling of kinematic robots for fault diagnosis
pp. 2277-2290(14)
Authors: Liu, H.; Coghill, G. M.; Xu, H.-Y.

Favourites:
ADD

Conceptual framework for lot-sizing and scheduling of flexible flow lines
pp. 2291-2308(18)
Authors: Quadt, D.; Kuhn, H.

Favourites:
ADD

Optimal scheduling for flexible job shop operation
pp. 2323-2353(31)
Authors: Gomes, M.C.; Barbosa-PĆ³voa, A.P.; Novais, A.Q.

Favourites:
ADD

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more