Publisher: Taylor and Francis Ltd

More about this publication?
Related content
Volume 41, Number 12, 15 August 2003

< previous issue | all issues | next issue >

Favourites:Add to Favourites

General and flexible methodology and architecture for CAPP: GF-CAPP system
pp. 2643-2662(20)
Authors: González, F.; Rosado, P.

Favourites:Add to Favourites

An improved double sampling s chart
pp. 2663-2679(17)
Authors: He, D.; Grigoryan, A.

Favourites:Add to Favourites

Production scheduling using adaptable fuzzy logic with genetic algorithms
pp. 2681-2697(17)
Authors: Tedford, J. D.; Lowe, C.

Favourites:Add to Favourites
Favourites:Add to Favourites

Novel approach to multi-channel manufacturing system design
pp. 2711-2726(16)
Authors: Ozcelik, F.; Islier, A. A.

Favourites:Add to Favourites

Expert Enhanced Coloured Stochastic Petri Net and its application in assembly/disassembly
pp. 2727-2762(36)
Authors: Kumar, S.; Kumar, R.; Shankar, R.; Tiwari, M. K.

Favourites:Add to Favourites
Favourites:Add to Favourites

Continuous-time dynamic modelling of variable lead times
pp. 2787-2798(12)
Author: Wikner, J.

Favourites:Add to Favourites

Generally configured supply chain with flexible local control strategies
pp. 2817-2838(22)
Authors: Xiaobo, Zhao; Gong, Q.; Wang, J.

Favourites:Add to Favourites
Favourites:Add to Favourites

Finite capacity scheduling using a predetermined placement sequence
pp. 2851-2872(22)
Authors: Martin, Rodney L.; White, Christopher

Share Content

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
ingentaconnect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more