Skip to main content

Modelling and optimization of industrial manufacturing processes subject to no-wait constraints

Buy Article:

$71.00 + tax (Refund Policy)

This paper deals with scheduling of no-wait manufacturing processes. The main features of these systems are analysed and an industrial application is described in detail. No standard solution procedure has been devised in the literature for this difficult scheduling problem. We exploit a heuristic decomposition approach which allows the reduction of the searchable solutions space and makes use of sequencing and timetabling modules. The timetabling can be performed by a polynomial time algorithm. To make the sequencing decision we propose several heuristic rules, a decomposition approach making use of fuzzy logic and an algorithm based on tabu search. The extensive computational results reported show the clear superiority of the tabu search approach.

Document Type: Research Article

Publication date: 20 July 1999

More about this publication?
  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content