Production Planning and Control logo Taylor and Francis Ltd logo

Publisher: Taylor and Francis Ltd

Volume 16, Number 5, July 2005
Key:
Free Content - Free Content
New Content - New Content
Subscribed Content - Subscribed Content
Free Trial Content - Free Trial Content

< previous issue | next issue > | all issues

Editorial
pp. 425-425(1)

A parameterized-dispatching rule for a Logic IC sort in a wafer fabrication
pp. 426-436(11)
Authors: Lin, J. T.; Wang, F. K.; Kuo, P. C.

Purchase cards and inventory control—An analytical framework
pp. 437-443(7)
Authors: Chandrashekar, A.; Gopalakrishnan, M.

A network-based approach to integrated supply chain design
pp. 444-453(10)
Authors: Wu, T.; O'Grady, P.

Demand and supply network design scope for personalized manufacturing
pp. 454-469(16)
Authors: Montreuil, B.; Poulin, M.

Adaptive manufacturing scheduling: a flexible and configurable agent-based prototype
pp. 479-487(9)
Authors: Cheeseman, M. J.; Swann, P.; Hesketh, G. B.; Barnes, S.

Kanban implementation at a tyre manufacturing plant: a case study
pp. 488-499(12)
Authors: Mukhopadhyay, S. K.; Shanker, S.

Tooling layout on a press brake for sheet metal air bending
pp. 514-525(12)
Authors: Crauwels, H. A. J.; Collin, P.; Duflou, J.; Van Oudheusden, D.

< previous issue | next issue > | all issues

Key:
Free Content - Free Content
New Content - New Content
Subscribed Content - Subscribed Content
Free Trial Content - Free Trial Content
Share this item with others: These icons link to social bookmarking sites where readers can share and discover new web pages.
Page Help Click here for Page Help
Shopping cart
Tools
Sign in






Need to register?
Sign up here
Text size: A | A | A | A