Multilevel lot-sizing heuristics and freezing the master production schedule in material requirements planning systems

Buy Article:

$71.00 + tax (Refund Policy)

This paper compares the performance of a new improved heuristic (STIL) proposed by Coleman and McKnew (1991, Decision Sciences , 22 , 136-156) Wagner-Whitin (WW), cost-modified (MWW) and some simple lot-sizing rules found to perform well by Zhao et al . (1995, International Journal of Production Research , 33 (8), 2241-2276). It also investigates the impact of the lot-sizing ruleson the selection ofthe parametersfor freezing the master production schedule (MPS). The experimental settings include forecasting, master production scheduling and material requirements planning under a rolling time horizon. The result of the study shows that the STIL heuristic, WW rule and MWW rule do not really outperform the simple costmodified Silver-Meal (MSM) and the Silver-Meal/Lot-forLot (SM/LFL), even though they require substantially higher comheuristics against those of the Wagner-Whitin putation time. The study also shows that the selection of the parameters for freezing the MPS is not significantly influenced by the selection of the lot-sizing rules.

Keywords: MATERIAL REQUIREMENTS PLANNING MASTER PRODUCTION SCHEDULING LOT-SIZING SIMULATION

Document Type: Research Article

Publication date: 01 June 1998

More about this publication?
  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content