Design, construction and implementation of Superpave pilot projects under a quality assurance programme

Buy Article:

$59.35 plus tax (Refund Policy)


The research presented here outlines Massachusetts experience with design and construction of Superpave (SP) under a quality assurance (QA) programme. More specifically, this research documents the SP laboratory trial mixture formula (LTMF) design and verification procedures, SP QA specification requirements, field performance of the pilot SP projects, contractor's experiences with placing SP mixtures versus conventional hot mix asphalt mixtures, and modifications made to the Massachusetts SP specifications based on the first SP pilot project. Based on this study, the implementation of SP in Massachusetts has been successful. An effective procedure was developed to verify the contractors proposed SP LTMFs. The QA plan utilised by the Massachusetts Highway Department for acceptance of work has been effective, but data suggested changing some specification limits. Finally, the field performance of the SP mixture in terms of distress has been favourable.

Keywords: QA; SP; hot mix asphalt; performance and LTMF

Document Type: Research Article


Affiliations: 1: Department of Civil and Environmental Engineering, University of Mass Dartmouth, North Dartmouth, MA, USA 2: Massachusetts Division, Federal Highway Administration, Cambridge, MA, USA

Publication date: February 1, 2010

More about this publication?

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
Cookie Policy
ingentaconnect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more