Skip to main content

A new cost control model and indicators to measure productivity on building sites

Buy Article:

$54.08 plus tax (Refund Policy)

Abstract:

An accurate estimation of project costs is always a great challenge for a construction company, particularly when there is a commitment with the owner to achieve a project at a given price. It is thus essential to develop technical and logistic solutions (TLS) ensuring a good organisation and improving the productivity. These improvements are not yet well assessed because relevant models are not available at the right time. This paper presents a new approach for assessing productivity by using an analytical cost model and indicators widely used to measure the site productivity. A case study is described to validate the cost and indicator model. They can be used in a decision making process consisting of a comparative study of different TLS in order to select, in a predicted term, the TLS ensuring the best productivity. A decision support system for generating different alternatives to be compared is currently under development.

Keywords: BUILDING SITE PRODUCTIVITY; CONSTRUCTION COST; DECISION-MAKING; PROFIT MARGIN; SIMULATION

Document Type: Research Article

DOI: https://doi.org/10.1191/1471417502ci030oa

Affiliations: Laboratoire Génie Civil et Habitat, Ecole Supérieure d'InGEnieurs de Chambéry, Université de Savoie, France

Publication date: 2002-09-01

  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content
Cookie Policy
X
Cookie Policy
Ingenta Connect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more