Skip to main content

Publisher: Emerald Group Publishing Limited

Volume 18, Number 4, 2012

A framework for the evaluation of turnaround maintenance projects
pp. 368-383(16)
Author: Obiajunwa, Christopher C.

Favourites:
ADD

Condition based maintenance: a survey
pp. 384-400(17)
Authors: Prajapati, Ashok; Bechtel, James; Ganesan, Subramaniam

Favourites:
ADD

A risk based approach to asset integrity management
pp. 417-431(15)
Authors: Bharadwaj, Ujjwal R.; Silberschmidt, Vadim V.; Wintle, John B.

Favourites:
ADD

Aircraft maintenance planning and scheduling: an integrated framework
pp. 432-453(22)
Authors: Samaranayake, Premaratne; Kiridena, Senevi

Favourites:
ADD

Factors influencing the installation and maintenance of subsea petroleum production equipment: A case study
pp. 454-471(18)
Authors: Moreno-Trejo, Jorge; Kumar, Rajesh; Markeset, Tore

Favourites:
ADD

Preventive maintenance planning using group technology: A case study at Arab Potash Company, Jordan
pp. 472-480(9)
Authors: Almomani, Mohammed; Abdelhadi, Abdelhakim; Seifoddini, Hamid; Xiaohang, Yue

Favourites:
ADD

  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content