Artificial intelligence approach to calculation of hydraulic excavator cycle time and output

Authors: Edwards, D.J.; Griffiths, I.J.

Source: Mining Technology : IMM Transactions section A, Volume 109, Number 1, April 2000 , pp. 23-29(7)

Publisher: Maney Publishing

Key:
Free Content - Free Content
New Content - New Content
Subscribed Content - Subscribed Content
Free Trial Content - Free Trial Content

Abstract:

Accurate prediction of the cycle time and output of tracked hydraulic excavators is notoriously difficult, not least because such data are freely available to the mining practitioner from only a limited number of plant manufacturers. Previous research attempted to rectify this problem through the development of ESTIVATE. ESTIVATE utilized a multiple regression (MR) equation to predict machine cycle time and subsequently, on the basis of this, to estimate machine output and excavation costs. However, with a coefficient of determination (R2) of 0.88 and a mean absolute percentage error (MAPE) of 20%, the MR equation failed to provide an adequately robust predictor of machine cycle time. Improvement to ESTIVATE's predictive capacity was sought through the use of a feed-forward artificial neural network with back-propagation training. With a sum square error of 0.194 and a MAPE of 7% (that is, a 14% reduction on the equivalent MR equation) the feed-forward network provides a significant improvement over the MR equation. An aim in future work will be to expand the capability of the model to include long-reach machines.

Document Type: Research article

The full text electronic article is available for purchase. You will be able to download the full text electronic article after payment.

$48.00 plus tax

 

OR

Back to top

Key:
Free Content - Free Content
New Content - New Content
Subscribed Content - Subscribed Content
Free Trial Content - Free Trial Content
Page Help Click here for Page Help
Shopping cart
Tools
Sign in






Need to register?
Sign up here
Text size: A | A | A | A