Aesthetics versus function: the fall of the Dee bridge, 1847

Authors: Lewis, Peter R.; Gagg, Colin

Source: Interdisciplinary Science Reviews, Volume 29, Number 2, June 2004 , pp. 177-191(15)

Publisher: Maney Publishing

Key:
Free Content - Free Content
New Content - New Content
Subscribed Content - Subscribed Content
Free Trial Content - Free Trial Content

Abstract:

Numerous new bridges were needed when the railway line from London to Holyhead in Wales was built in the 1840s. The project's chief engineer, Robert Stephenson, chose a cast iron girder design to cross the river Dee just outside Chester, and the bridge was finished in November 1846. About six months later, on 24 May 1847, a local train was crossing the final span when one of the girders failed suddenly, sending most of the train crashing into the river below. Five lives were lost. The accident created a national furore, and Stephenson came close to being accused of manslaughter for the design. We have reviewed the witness evidence and concluded that the bridge probably failed by fatigue due to a defect at a sharp corner in a flange on a girder. The corner was present in a cavetto moulding, which had presumably been added as an artistic flourish.

Document Type: Research article

DOI: 10.1179/030801804225012563

The full text electronic article is available for purchase. You will be able to download the full text electronic article after payment.

$39.00 plus tax      Refund Policy

 

OR

Back to top

Key:
Free Content - Free Content
New Content - New Content
Subscribed Content - Subscribed Content
Free Trial Content - Free Trial Content
Share this item with others: These icons link to social bookmarking sites where readers can share and discover new web pages.
Page Help Click here for Page Help
Shopping cart
Tools
Sign in






Need to register?
Sign up here
Text size: A | A | A | A