Publisher: Elsevier

Related content
Volume 100, Number 2, 16 July 1997

< previous issue | all issues | next issue >

Favourites:Add to Favourites

Information management for concurrent engineering
pp. 253-265(13)
Authors: Eversheim, W.; Roggatz, A.; Zimmermann, H.; derichs, T.

Favourites:Add to Favourites

A methodology for the reduction of imprecision in the engineering process
pp. 277-292(16)
Authors: Giachetti, R.E.; Young, R.E.; Roggatz, A.; Eversheim, W.; Perrone, G.

Favourites:Add to Favourites

Intelligent systems for engineering design and configuration problems
pp. 315-326(12)
Authors: Muller, K.; Sebastian, H.

Favourites:Add to Favourites

Simultaneous engineering approach to an integrated design and process planning
pp. 327-337(11)
Authors: Eversheim, W.; Bochtler, W.; Graszler, R.; Kolscheid, W.

Favourites:Add to Favourites

Feature based feedback into the early stages of design
pp. 338-350(13)
Authors: Durr, H.; Schramm, M.

Favourites:Add to Favourites

Evaluating alternative production cycles using the extended fuzzy AHP method
pp. 351-366(16)
Authors: Weck, M.; Klocke, F.; Schell, H.; Ruenauver, E.

Favourites:Add to Favourites

Potentials and procedure for the integrated planning of production technologies in the early phases of product development
pp. 367-378(12)
Authors: Eversheim, W.; Klocke, F.; Schmitz, W.; Brandenburg, F.; Winands, N.

Favourites:Add to Favourites

Concurrent engineering of work and production systems
pp. 379-398(20)
Authors: Stahl, J.; Luczak, H.; Langen, R.; Weck, M.; Klonaris, P.; Pfeifer, T.

Share Content

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
ingentaconnect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more