Skip to main content

Publisher: Elsevier

Volume 91, Number 1, 24 May 1996

Favourites:
ADD
Favourites:
ADD

Dynamic control charts for finite production runs
pp. 38-55(18)
Author: Tagaras, G.

Favourites:
ADD
Favourites:
ADD

Joint replacement in an operational planning phase
pp. 74-88(15)
Authors: dekker, R.; Wildeman, R.E.; van Egmond, R.

Favourites:
ADD
Favourites:
ADD

An exchange heuristic imbedded with simulated annealing for due-dates job-shop scheduling
pp. 99-117(19)
Authors: Zesheng, H.; Taeyong, Y.; Tiger, A.

Favourites:
ADD

Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process
pp. 124-143(20)
Authors: Yeong-Dae, K.; Hyeong-Gyu, L.; Moon-Won, P.

Favourites:
ADD
Favourites:
ADD

A fast tabu search algorithm for the permutation flow-shop problem
pp. 160-175(16)
Authors: Nowicki, E.; Smutnicki, C.

Favourites:
ADD

Sevast'yanov's algorithm for the flow-shop scheduling problem
pp. 176-189(14)
Author: Lourenco, H.R.

Favourites:
ADD
Favourites:
ADD

Solution of the generalized Townsend single machine scheduling model
pp. 203-210(8)
Authors: Szwarc, W.; Mukhopadhyay, S.K.

Favourites:
ADD

Access Key

Free Content
Free content
New Content
New content
Open Access Content
Open access content
Subscribed Content
Subscribed content
Free Trial Content
Free trial content
Cookie Policy
X
Cookie Policy
ingentaconnect website makes use of cookies so as to keep track of data that you have filled in. I am Happy with this Find out more