Accelerating the process of engineering change orders: capacity and congestion effects
Authors: Loch, Christoph H.; Terwiesch, Christian
Source: Journal of Product Innovation Management, Volume 16, Number 2, March 1999 , pp. 145-159(15)
Publisher: Blackwell Publishing
Key:
- Free Content
- New Content
- Subscribed Content
- Free Trial Content
Abstract:
Engineering change orders (ECOs) are important drivers of development costs and lead time. This article analyzes the process of administering engineering change orders in the case of the climate control system development within a large vehicle development project. This administrative process encompasses the emergence of a change (e.g., a problem or a market-driven feature change), its management approval, and final implementation. Despite strong time pressure, this process can take several weeks, several months, and, in extreme cases, even over 1 year. Such a long lead time is especially remarkable as the actual processing time for the change typically does not exceed 2 weeks. Based on our case study, we develop an analytical framework that explains how such an extreme ratio between theoretical processing time and actual lead time is possible. The framework identifies congestion, stemming from scarce capacity coupled with processing variability, as a major lead time contributor. We outline five improvement strategies that an organization can use in order to reduce ECO lead time, namely, flexible capacity, balanced workloads, merged tasks, pooling, and reduced setups and batching.Document Type: Research article
DOI: 10.1016/S0737-6782(98)00042-3
Key:
- Free Content
- New Content
- Subscribed Content
- Free Trial Content

Click here for Page Help